Orange County NC Website
38 <br /> Outline <br /> • Professional Background Public Supply Well Yield and Water <br /> • What is a Well? Quality Testing <br /> • The Hydrologic Cycle • Downhole Video Survey <br /> • Well Overview • 24-Hour Drawdown <br /> • Public Supply Well Overview • Water Quality Testing <br /> • Final Construction and Permitting <br /> • Public Supply Well Siting • Completion of Drilling and Testing <br /> • Hydrogeologic Evaluation • Design and Construction <br /> • Setbacks <br /> • Well Drilling Costs <br /> • Public Supply Well Drilling <br /> • Long-Term Well Health <br /> • Well Construction <br /> A K M <br /> APPLIED RESOURCE MANAGEMENT,PC <br />