Orange County NC Website
39 <br /> 1 Slide #27 <br /> Wastewater Plant <br /> Wastewater Plant Daily Flows <br /> 5 f �• <br /> 4-5 ••� <br /> 4 <br /> 3.5 <br /> �2019 AVG <br /> f �2024 AVG <br /> 2.5 'r ••� • �. ••••2019 MAX <br /> 2 •�••2024 MAX <br /> ,.�;� •�r iMaz Hydraulic Capacity <br /> i <br /> 0 <br /> Jan Feb Mar Apr May June July Aug Sept Oct Plov Dec <br /> 2 <br /> 3 Bryant Green said the max days are routinely significantly higher than the capacity of the <br /> 4 plant to pass sewage through it, while still treating it to an acceptable standard. This is another <br /> 5 thing the town monitors, but this is not as big a restriction as some of these nutrient limits. <br /> 6 Chair Bedford asked if that is due to rainfall and stormwater. <br /> 7 Bryant Green said yes. <br /> 8 <br /> 9 <br />