Browse
Search
Agenda 11-06-2025; 8-a - Minutes for October 7, 2025 Business Meeting and October 14, 2025 Joint Meeting with Chiefs Association and Work Session
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2025
>
Agenda - 11-06-2025 Business Meeting
>
Agenda 11-06-2025; 8-a - Minutes for October 7, 2025 Business Meeting and October 14, 2025 Joint Meeting with Chiefs Association and Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2025 11:58:06 AM
Creation date
10/30/2025 1:35:56 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-a
Document Relationships
Agenda for November 6, 2025 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 11-06-2025 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
22 <br /> 1 Perdita Holtz noted that the map pictured on the slide [and enlarged on the next page of <br /> 2 the minutes] has been amended a few times since the plan was adopted. She said there have <br /> 3 also been several implementation measures over the years, including a swap of jurisdictional <br /> 4 lands, basically swapping EJS and non-ETJ areas. Additionally, there was an expansion of the <br /> 5 economic development area south of 1-40 in 2020. She added that at some point during the mid- <br /> 6 2010s, Orange County and the Town of Hillsborough adopted a resolution indicating both <br /> 7 jurisdictions considered the implementation of the plan to be complete. Perdita Holtz explained <br /> 8 that the map shows the boundaries of the Hillsborough urban service area, the area the town <br /> 9 anticipated serving with water and sewer. She said the Board will hear more later about the utility <br /> 10 capacity study and the sustainability plan that Hillsborough completed approximately two years <br /> 11 ago. She explained that eventually, the town will initiate the process to pull back its utility service <br /> 12 area due to capacity constraints, which would require amendments to this plan. <br /> 13 Commissioner Carter asked if there was anything in place like this before the COCA, or if <br /> 14 this was a greenfield-type effort. <br /> 15 Perdita Holtz said this was a greenfield-type effort except for a courtesy review agreement <br /> 16 for development projects that was in place before, and still is in place, with the Town of <br /> 17 Hillsborough. <br /> 18 <br /> 19 <br /> 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.