Orange County NC Website
13 <br /> 1 Slide #19 <br /> Successes <br /> • Emergency protocols were successfully <br /> implemented and ,performed as intended under <br /> operational stress. <br /> • The exceptional dedication and performance of <br /> personnel were instrumental in ensuring the <br /> safety of the community. <br /> • Effective collaboration with partner agencies <br /> proved to be a critical component of the <br /> successful response. <br /> 19 <br /> 2 <br /> 3 <br /> 4 Slide #20 <br /> Challenges <br /> • Tropical Storm Chantal formed and made landfall with little to no <br /> advance notice, challenging standard preparedness timelines and <br /> forcing the immediate execution of emergency protocols. <br /> • The storm event resulted in severe and widespread impacts. <br /> • Downed trees and flooding blocked roads, created access <br /> limitations throughout the county. <br /> • Significant challenges were encountered in maintaining <br /> communications and situational awareness. <br /> • The scale of the incident exceeded local response capabilities, <br /> necessitating assistance from state resources. <br /> • Some apparatus and equipment was damaged during response to <br /> the storm. <br /> zn <br /> 5 <br /> 6 Chief Potter said damaged equipment will take time to get replacements due to the delays <br /> 7 in manufacturing. <br /> 8 Chair Bedford asked if departments will be involved in the Emergency Operations Plan <br /> 9 update. <br /> 10 Kirby Saunders said yes. <br />