Browse
Search
Agenda 11-06-2025; 5-b - Unified Development Ordinance Text Amendments – Impervious Surfaces, Watershed Protection Overlay Districts, and Stream Buffers
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2025
>
Agenda - 11-06-2025 Business Meeting
>
Agenda 11-06-2025; 5-b - Unified Development Ordinance Text Amendments – Impervious Surfaces, Watershed Protection Overlay Districts, and Stream Buffers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2025 11:56:56 AM
Creation date
10/30/2025 1:35:56 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-b
Document Relationships
Agenda for November 6, 2025 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 11-06-2025 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 4: Overlay Zoning Districts 18 <br /> Section 4.2:Watershed Protection Overlay Districts2F <br /> IMPERVIOUSTABLE 4.2.6: <br /> • <br /> DISTRICT <br /> 6 aGFe H;iRiFA1_1.rA let GiZe I.Vith p9teRtial ef up to five lets as Small as two�PA_Fes_;4e.r lets Of F8GGFd SeptembeF 1, <br /> 2015 (LJRiV8FS'tY Lake)GF QGtebeF 19, 1999 (GaRe GFeelo; AND <br /> 50% impervious surface limiti&R for all fire stations and solid waste collection centers_. Stormwater Control <br /> Measures(SCMs)are required if impervious surface exceeds 12%.=2;A <br /> 12% impervious surface limitl&R for all other non-residential uses. f11, X21=ANB <br /> UNIV-PW Oen-site infiltration of the first inch of stormwater runoff is required for all non-residential uses.; n—r•.,^,in <br /> CANE-PW <br /> For CANE-PW,the total impervious surface limit(total Built Upon Area)for non-residential uses is limited to a <br /> "mit ef1-.0%of the total watershed area(i.e.,a total of 139 acres of impervious surface within CANE-PW). [31 <br /> 5fer nnn_residentia1 use (139,nreS;n CAn1F-P�. -acre minimum lot size with potential of up to five lots as <br /> small as two acres per lot for lots that were created prior to September 1, 2015 (for UNIV-PW)or October 19, <br /> 1999 forCANE-PW . 7-2 <br /> Fnum let size AND <br /> 50% impervious surface limitl&R for all fire stations and solid waste collection centers. Stormwater Control <br /> Measures(SCMs)are required if impervious surface exceeds 12%. f11, f21;A <br /> 12% impervious surface limitl&R for all other non-residential uses. r11, r21�9 <br /> LITTLE-PW Oen-site infiltration of the first inch of stormwater runoff is required for all non-residential uses.=,' t <br /> For LITTLE-PW,the total impervious surface limit(total Built Upon Area)for non-residential uses is limited to a <br /> i+mit of 1-.G%--of the total watershed area (i.e., a total of 406 acres of impervious surface within LITTLE-PW). [31 <br /> fnr n sidnnfi of i s e (40162 o n 1_1 TT L C_PV <br /> 2-acre minimum lot size. [1], [2]73 <br /> 70% impervious surface limitlSR in Economic Development, Commercial and/or Commercial--Industrial Nodes <br /> as designated in the Land Use Element of the Comprehensive Plan (high-density option)_-w4l;-Stormwater <br /> Control Measures (SCMs)are required if i#impervious surface 1 exceeds--1 2%. f11_[_J=A <br /> 50% impervious surface limiti-IR for all fire stations and solid waste collection centers outside of Commercial <br /> and/or Commercial-Industrial Nodes as designated in the Land Use Element of the Comprehensive Plan. with <br /> Stormwater Control Measures(SCMs)are required if impervious surface if ISR exceeds=12%. f11, f21=A <br /> 12% impervious surface IimitIgR for all other non-residential uses outside of Commercial and/or Commercial- <br /> U-ENO-PW Industrial Nodes as designated in the Land Use Element of the Comprehensive Plan. [11, [21 <br /> BACK-PW =AND <br /> Oen-site infiltration of the first inch of stormwater runoff is required for all non-residential uses. A <br /> For U-ENO-PW, the total impervious surface limit(total Built Upon Area)for non-residential uses is limited to 5% <br /> of the total watershed area (i.e., a total of A 10mitef 1,151 acres of impervious surface within U-ENO-PW)AGA4e_ <br /> l31 <br /> For BACK-PW,the total impervious surface limit(total Built Upon Area)for non-residential uses is limited to 1% <br /> of the total watershed area (i.e., a total of 163 acres of impervious surface within BACK-PW). f31 skien#a4 <br /> threugheut IJ ENG PVV othreugheut BACK PVV(1 Z4 <br /> 72 Staff recommendations to improve reading clarity. <br /> 73 Staff recommendations to improve reading clarity. <br /> 74 Staff recommendations to improve reading clarity. <br /> Orange County, North Carolina—Unified Development Ordinance Page 4-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.