Orange County NC Website
f <br /> i t STATt q <br /> 58 <br /> y. <br /> W r <br /> ROY COOPER <br /> Governor + O <br /> ELIZABETH S.BISER ' ^ , <br /> Secretary Y Qunnntmd�Y <br /> RICHARD E.ROGERS,JR. NORTH CAROLINA <br /> Director Environmental Quality <br /> September 12, 2024 <br /> Lanie Powell and Eva Brown <br /> P.O. Box 1391 <br /> Smithfield, NC 27577 <br /> Re: Preliminary Well Site Approvals <br /> Hwy 86 Property Potable Water System <br /> Water System No.: NC4068033 <br /> Orange County <br /> Dear Ms. Powell and Ms. Brown: <br /> On July 1, 2024, Melody Markert with the NC Department of Environmental Quality Public Water <br /> Supply (PWS) Section met with Tyler MacConnell and conducted a preliminary investigation of the <br /> proposed well sites listed below and shown on the attached drawing provided by the engineer. The <br /> proposed wells have been assigned Water System Facility (WSF) Identification Numbers and <br /> Sampling Point Codes as indicated below. <br /> WSF ID Sampling Description of Well Site Preliminary Latitude <br /> No. Point Code and Longitude <br /> W01 RW1 100' radius around the proposed well location 35° 06' 23.48" N <br /> (Well #1) at the preliminary coordinates, 790 06' 31.95"W <br /> located on Lot 1. <br /> W02 RW2 100' radius around the proposed well location 350 06' 9.62" N <br /> (Well #2) at the preliminary coordinates, 790 06' 21.31"W <br /> located on Lot 33. <br /> W03 RW3 100' radius around the proposed well location 35° 06' 5.63" N <br /> (Well #3) at the preliminary coordinates, 790 06' 2S.60" W <br /> located on Lot 32. <br /> This letter is provided by the PWS Section, in accordance with Rule.0305(b) of the Rules Governing <br /> Public Water Systems (15A NCAC 18C),to provide permission to drill wells at the listed sites in order <br /> to establish the quality and quantity of water and the suitability of the wells as sources for a public <br /> water system. <br /> The proposed wells must be drilled within 24 months of the date of this letter. If not drilled <br /> within this 24-month period,this Preliminary Well Site Approval letter is void and permission <br /> to drill the wells is no longer valid. To regain permission to drill the wells, PWS Section staff <br /> D E Q�� North Carolina Department of Environmental Quality I Division of Water Resources <br /> Raleigh Regional Office 1 3800 Barrett Drive 1 Raleigh,North Carolina 27609 <br /> Depa"c:nfEnvira �'r 919.791.4200 <br /> Department of Envlranmeirtal Dual <br />