Browse
Search
Agenda 11-06-2025; 5-a - Application for Zoning Atlas Amendment – 1039-UT NC 86 N, Hillsborough, Hillsborough Township
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2025
>
Agenda - 11-06-2025 Business Meeting
>
Agenda 11-06-2025; 5-a - Application for Zoning Atlas Amendment – 1039-UT NC 86 N, Hillsborough, Hillsborough Township
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2025 11:56:10 AM
Creation date
10/30/2025 11:31:48 AM
Metadata
Fields
Template:
BOCC
Date
11/6/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda for November 6, 2025 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2025\Agenda - 11-06-2025 Business Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
49 <br /> Adjacent well surface elevations before,during and after drawdown: <br /> As stated above,drawdown of the proposed community well was completed between 1430 on 29 July <br /> 2025 and 1500 on 30 July 2025 (Appendix 1). Data collection at the South and Waller Wells began on <br /> 23 July and continued until 8 August 2025. The drawdown confirmed that the proposed community <br /> well has a steady state (i.e.,the balance of withdrawal and groundwater recharge, with no change to <br /> water surface elevation) of approximately 112 gallons per minute. The initial pump test, which was <br /> completed on 19 November 2024 showed a well yield of 84 gallons per minute (Appendix 2). <br /> As depicted in Graphs 2 and 3, no water level changes beyond the normal variations discussed above <br /> were documented in either the South Well or the Waller Well during drawdown to either maximum <br /> depth (i.e., 578 feet below the surface)or steady state withdrawal (i.e. 112 gallons/minute),as well as <br /> during the subsequent recovery period. <br /> Graph 2 Drawdown Well Data (South Well): 7/23/2025-8/8/2025 <br /> Date/Time <br /> o° o° o° o° o° o° o° o° o° °o °o °o °o °o °o °o <br /> tiff titi titi N titi ly. titi titi titi ti. ry I/ ti. r1,. ry -Z <br /> ti� ti� ti� ti� ti� ti� ti� ti� ti� hti hti �ti �ti hti �ti �ti hti <br /> 0 o o o o o o o o <br /> ,\\T ,\\ti -P ,\\ti Asti <br /> 0 �- <br /> 20 <br /> 40 <br /> 60 <br /> Q 80 - <br /> a� <br /> 0 <br /> 100 <br /> s <br /> a� <br /> 120 <br /> CU <br /> 140 <br /> 160 <br /> 180 <br /> 200 <br /> Community Well Drawdown Period South Well <br /> FLAN G EFS <br /> ENVIRONMENTAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.