Browse
Search
2025-631-E-AMS-Brady Services-Justice Facility Mural Courtroom HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-631-E-AMS-Brady Services-Justice Facility Mural Courtroom HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2025 9:31:32 AM
Creation date
10/23/2025 9:29:16 AM
Metadata
Fields
Template:
Contract
Date
10/8/2025
Contract Starting Date
10/8/2025
Contract Ending Date
10/11/2025
Contract Document Type
Contract
Amount
$295,500.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Page 8 of 13 <br /> <br /> <br />Any code deficiencies related to the existing conditions not specifically identified in our <br />proposal is not included in our scope of work. <br /> <br />Unforeseen conditions related to the owners equipment or building that adversely impact <br />the cost of the project may result in additional changes. <br /> <br />The building heating and cooling load calculations are based on information provided by the <br />owner. Discrepancies of information provided and actual conditions could result in equipment <br />being sized incorrectly. Brady is not responsible for problems resulting from incorrect <br />information provided by the owner. <br /> <br />This proposal is subject to cancellation by Brady in the event any contract or purchase order <br />related to this proposal contains a provision that requires Brady to comply with any guidance <br />for contractor or subcontractor workplace locations published by the Safer Federal Workplace <br />Task Force. <br /> <br />This proposal is subject to cancellation by Brady in the event Brady is unable to perform due <br />to inability to secure qualified subcontractors willing to comply with any guidance for <br />contractor or subcontractor workplace locations published by the Safer Federal Workplace <br />Task Force, or Brady’s inability to comply with such guidance. <br /> <br /> <br /> <br /> <br />Green Building Initiative <br />To encourage the implementation of energy efficient building systems, including HVAC systems, Section 179D <br />of the Internal Revenue Code provides for tax deductions for qualifying improvements. Owners subject to <br />federal income taxes are advised to consult their tax advisors for additional information. <br />In the case of Owners not subject to federal income tax, Section 179D provides for the allocation of the tax <br />deduction to the designer of the energy efficient building system as an additional incentive to incorporate the <br />most efficient system affordable. Brady is the designer of the system described in this Proposal. Accordingly, <br />once the energy efficient building system is placed into service, it is understood and agreed that the tax <br />deduction granted pursuant to Section 179D of the Internal Revenue Code will be allocated to Brady, in <br />consideration of which Brady will use its best efforts to maximize the energy efficiency of the system being <br />contracted. <br /> <br /> <br /> <br /> <br />Docusign Envelope ID: 2DCEAB2D-04A3-4533-B5DC-776CBF4C16AD
The URL can be used to link to this page
Your browser does not support the video tag.