Browse
Search
2025-631-E-AMS-Brady Services-Justice Facility Mural Courtroom HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-631-E-AMS-Brady Services-Justice Facility Mural Courtroom HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2025 9:31:32 AM
Creation date
10/23/2025 9:29:16 AM
Metadata
Fields
Template:
Contract
Date
10/8/2025
Contract Starting Date
10/8/2025
Contract Ending Date
10/11/2025
Contract Document Type
Contract
Amount
$295,500.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Page 7 of 13 <br /> <br />All control wiring. Open cable in concealed accessible areas. EMT conduit in all other <br />locations. <br /> <br />Field mounting of all other control devices <br /> <br />Field level communication trunk and 24V power for all floor level controllers. <br /> <br />5. Siemens to provide all controllers, devices and programming to control the following <br />equipment per the sequences of operation: <br /> <br />(1) Water Source Heat Pump – Rooftop Unit (WSHP-1) <br /> <br />BACnet MS/TP integration to factory mounted BACnet module <br /> <br />Siemens to provide BACnet router <br /> <br />6. Space Sensor/Thermostat furnished and wired by Brady Services <br /> <br />7. All instrumentation to be Siemens standard products. <br /> <br />8. All work to be completed during normal business hours. <br /> <br />9. One-year warranty. <br /> <br /> <br />Air Balance <br />Scope includes air balancing per drawing M1, 3.5.B <br /> <br />Start-Up <br />A Brady factory-authorized technician will perform start-up and inspection of the new WSHP <br />according to the manufacturers written instructions. <br /> <br />Clarifications <br /> <br />IP drop provided by Orange County IT for the Siemens BACnet router <br /> <br />This project will require both straight time and overtime work. Work that is loud, intrusive, <br />and unsafe for an occupied building will be performed at night, and other work will be <br />performed during normal working hours. <br /> <br />Brady excludes any asbestos abatement and any other hazardous material abatement. <br /> <br />If any asbestos is found that will impact the project, all work shall stopped until the owner <br />has it properly abated. <br /> <br />Brady requires that the equipment for this project go through a submittal and review process <br />to verify equipment design and performance before the final order of equipment will be <br />released. This is completed to ensure that the end result meets the owner’s expectations. <br />Brady will request that you assign a company representative to review and sign off on the <br />equipment prior to order placement. <br /> <br />When crane work is to be performed over an occupied area a crane lift plan will be provided <br />by the crane company. The plan will be reviewed by Brady’s onsite superintendent and your <br />site appointed personal before any lifting begins. We will require the area surrounding the lift <br />be cleared and barricaded during the work. Once all lifting has been completed all work may <br />resume. <br />Docusign Envelope ID: 2DCEAB2D-04A3-4533-B5DC-776CBF4C16AD
The URL can be used to link to this page
Your browser does not support the video tag.