Browse
Search
2025-631-E-AMS-Brady Services-Justice Facility Mural Courtroom HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-631-E-AMS-Brady Services-Justice Facility Mural Courtroom HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2025 9:31:32 AM
Creation date
10/23/2025 9:29:16 AM
Metadata
Fields
Template:
Contract
Date
10/8/2025
Contract Starting Date
10/8/2025
Contract Ending Date
10/11/2025
Contract Document Type
Contract
Amount
$295,500.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Page 6 of 13 <br /> <br />Crane and Rigging <br />Brady will furnish all crane, rigging, and trucking as needed for this project. <br /> <br /> <br />Image 1: Proposed location of Crane <br /> <br />Upon receipt of equipment on the job site, Brady will inspect the unit for possible damage <br />during transit. This will include an inspection of unit exterior, all doors, access panels and <br />openings. If damage has occurred it will be immediately reported to the delivering carrier <br />and the damage noted on the receiving copy of the bill of lading. <br /> <br />Fire Alarm <br />Brady will furnish and install a duct smoke detector, conduit and wiring between the smoke <br />detector and the AHU motor control circuit to interrupt operation upon sensing an alarm <br />condition per code. Duct detector to be also tied to the building fire alarm system. <br /> <br />Controls <br /> <br />The existing Siemens Desigo CC Building Automation System will be expanded to include the <br />integration of the new WSHP to the system. This scope includes: <br /> <br />1. System engineering, installation, start-up, check-out, and documentation per project <br />requirements. <br /> <br />2. Provide graphics for all controlled equipment on the existing Insight Workstation. <br />Siemens includes a graphical representation of each major equipment and associated <br />floor plan. <br /> <br />3. Existing WSHP to be abandoned in place. <br /> <br />4. Electrical control and interlock wiring and labor of installation for HVAC controls. <br />Installation and wiring to include the following: <br /> <br />Docusign Envelope ID: 2DCEAB2D-04A3-4533-B5DC-776CBF4C16AD
The URL can be used to link to this page
Your browser does not support the video tag.