Orange County NC Website
<br /> <br />Page 4 of 13 <br /> <br /> <br />• Hose Kits <br />Item: A1 Qty: 1 Tag(s): HAYS-1 <br />1-1/2" diameter hose (Field Installed) <br />36" stainless steel hose (Field Installed) <br />Strainer with blow down valve and hose connector (Field Installed) <br />Supply ball valve with pressure/temperature ports (Field Installed) <br />Return ball valve with pressure/temperature port (Field Installed) <br />Manual Balancing Valve Flow Control (Field Installed) <br />Memory Stop (manual balancing valve) <br />Zone valve (Field Installed) <br />19 CV (1.5" hose)(13.4 - 42.5 gpm) <br />Ball Valve or Manual Hose Kit with Zone Valve (Field Installed) <br /> <br />Brady will Fab and install (1) Steel Frame on Roof <br /> <br />Brady will Fab and install Cross braces for the Structural steel for the New RTU WSHP to <br />penetrate through the roof and mounted. <br /> <br />Brady will Fab and Install (1) New Roof Access Ladder under 20ft <br /> <br />Brady will have a Chase way built for the New Roof Access Ladder <br /> <br />Brady will have a Walking plate form inside Attic space to re-route access from the Existing <br />access point. <br /> <br />Brady will install (1) New maximum size allowed Roof Access Roof Hatch for the New Roof <br />Access Ladder. <br /> <br />Pipe, Valves, Fittings <br />Brady will furnish and install all pipe, manual operated valves, and fittings, as needed to <br />connect the chilled water supply and return piping to the new AHU. <br /> <br />Brady will extend piping to the new RTU WSHP. <br /> <br />All chilled water supply and return piping 2" and smaller will be T&C schedule 40 carbon steel <br />pipe, with screwed fittings of the same materials and weight as the piping in which they are <br />installed. <br /> <br />Electrical <br />Brady will replace existing disconnect, conduit and conductors required for load side electrical <br />service from point of existing disconnect to the new AHU. Disconnect, conduit and conductors <br />will be sized per the NEC and based on the AHU MOP and MCA provided to Brady by the <br />equipment manufacturer. <br /> <br />Brady will be able to utilize an existing spare amp breaker located in panel. The electrical <br />load of the panel has not been verified to handle the load of the new AHU. <br /> <br />Brady will furnish and install conduit and conductors that is required for line side electrical <br />service from existing electrical panel to service disconnect located within eye sight of the <br />AHU. <br /> <br />Electrical connection to equipment will be made with short lengths of flexible "Liquid - Tite" <br />conduit. <br /> <br />All equipment has been selected for 208/230 volts, 60 hertz, and 3 phase electrical service. <br />Docusign Envelope ID: 2DCEAB2D-04A3-4533-B5DC-776CBF4C16AD