Orange County NC Website
Orange County-Solar Feasibi I ity Study Submitted by Pisgah Energy �4 <br /> PISGAH ENERGY <br /> �zs��N�.,t�t�o�•MtN� <br /> overall layout and heights, as well as basic information about the solar PV system such as capacity and total <br /> area of PV system, and the upward, downward, lateral reaction forces that the canopy will transfer to the <br /> parking deck. NV5 will review these details and verify that that the garage can or cannot accommodate the <br /> structural forces from the solar PV canopy. <br /> • Recommendations and design for battery-based systems for critical back-up power and/or utility savings. <br /> • Continued design-development, production of construction documents, and construction administration <br /> services after feasibility. <br /> • Design-Build Construction Services and Commissions Services. <br /> • 3-D Modeling. <br /> • EV Charging station evaluation. <br /> Current standard billing rates are as follows: <br /> Pisgah Energy Position Title <br /> Senior Project Manager...................................................................................................................$196/hr. <br /> Project Manager/Designer............................................................................................................$176/hr. <br /> MasterElectrician........................................................................................................................$176/hr. <br /> Energy Usage Analyst/Utility Interconnection Specialist...................................................................$176/hr. <br /> ConstructionManager..................................................................................................................$156/hr. <br /> NV5 Position Title <br /> VicePresident..................................................................................................................................$295/hr. <br /> GroupLeader.................................................................................................................................$200/hr. <br /> ProjectManager...........................................................................................................................$150/hr. <br /> ProjectEngineer.....................................................................................................................................$140/hr. <br /> Reimbursable Expenses-Reimbursable expenses shall be in addition to the compensation for basic and <br /> additional services and will be invoiced according to the line items below and will not exceed these values. <br /> These services include actual expenditures incurred by Pisgah Energy and NV5. Reimbursable expenses <br /> include: <br /> Orange County Reimbursable Expenses: <br /> • Lodging expenses—Not to Exceed -$1,080 <br /> • Meal expenses—Not to Exceed-$650 <br /> • Travel expenses(Mileage rates per current NCDOR)—Not to Exceed-$1,700 <br /> Town of Hillsborough Reimbursable Expenses: <br /> • Lodging expenses—Not to Exceed -$540 <br /> • Meal expenses—Not to Exceed-$250 <br /> • Travel expenses(Mileage rates per current NCDOR)—Not to Exceed-$500 <br /> SolarProposal <br />