Browse
Search
Agenda 10-21-2025; 8-c - Memorandum of Understanding Between Orange County and Town of Hillsborough for the Solar Feasibility Study, and Approval of Budget Amendment #3-A
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2025
>
Agenda - 10-21-2025 Business Meeting
>
Agenda 10-21-2025; 8-c - Memorandum of Understanding Between Orange County and Town of Hillsborough for the Solar Feasibility Study, and Approval of Budget Amendment #3-A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2025 11:57:19 AM
Creation date
10/16/2025 1:41:58 PM
Metadata
Fields
Template:
BOCC
Date
10/21/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-c
Document Relationships
Agenda for October 21, 2025 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 10-21-2025 Business Meeting
ORD-2025-035-Approval of Amendments to the Orange County Code of Ordinances Section 28 – Personnel Regarding Law Enforcement Special Separation Allowance
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
RES-2025-053-Public Hearing and Resolution for Orange County to Participate in the North Carolina commercial property
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2025
RES-2025-054-Approval of Amendments to the Orange County Code of Ordinances Section 28
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County-Solar Feasibi I ity Study Submitted by Pisgah Energy �4 <br /> PISGAH ENERGY <br /> �zs��N�.,t�t�o�•MtN� <br /> overall layout and heights, as well as basic information about the solar PV system such as capacity and total <br /> area of PV system, and the upward, downward, lateral reaction forces that the canopy will transfer to the <br /> parking deck. NV5 will review these details and verify that that the garage can or cannot accommodate the <br /> structural forces from the solar PV canopy. <br /> • Recommendations and design for battery-based systems for critical back-up power and/or utility savings. <br /> • Continued design-development, production of construction documents, and construction administration <br /> services after feasibility. <br /> • Design-Build Construction Services and Commissions Services. <br /> • 3-D Modeling. <br /> • EV Charging station evaluation. <br /> Current standard billing rates are as follows: <br /> Pisgah Energy Position Title <br /> Senior Project Manager...................................................................................................................$196/hr. <br /> Project Manager/Designer............................................................................................................$176/hr. <br /> MasterElectrician........................................................................................................................$176/hr. <br /> Energy Usage Analyst/Utility Interconnection Specialist...................................................................$176/hr. <br /> ConstructionManager..................................................................................................................$156/hr. <br /> NV5 Position Title <br /> VicePresident..................................................................................................................................$295/hr. <br /> GroupLeader.................................................................................................................................$200/hr. <br /> ProjectManager...........................................................................................................................$150/hr. <br /> ProjectEngineer.....................................................................................................................................$140/hr. <br /> Reimbursable Expenses-Reimbursable expenses shall be in addition to the compensation for basic and <br /> additional services and will be invoiced according to the line items below and will not exceed these values. <br /> These services include actual expenditures incurred by Pisgah Energy and NV5. Reimbursable expenses <br /> include: <br /> Orange County Reimbursable Expenses: <br /> • Lodging expenses—Not to Exceed -$1,080 <br /> • Meal expenses—Not to Exceed-$650 <br /> • Travel expenses(Mileage rates per current NCDOR)—Not to Exceed-$1,700 <br /> Town of Hillsborough Reimbursable Expenses: <br /> • Lodging expenses—Not to Exceed -$540 <br /> • Meal expenses—Not to Exceed-$250 <br /> • Travel expenses(Mileage rates per current NCDOR)—Not to Exceed-$500 <br /> SolarProposal <br />
The URL can be used to link to this page
Your browser does not support the video tag.