Orange County NC Website
Orange County-Solar Feasibi I ity Study Submitted by Pisgah Energy 4 <br /> PISGAH ENERGY <br /> Uz514N a VE V.FELO YMI:.N'd' <br /> investigation will require support from County and Town staff members to access the facilities.Access to the rooftops, <br /> electrical rooms and IT rooms must be provided. Site visit reports submitted to County and Town staff. <br /> 5) Preliminary Solar Design and Helioscope Production Reports — Helioscope is the solar design and production <br /> modeling software that will be used for the preliminary designs. The Helioscope report defines the DC/AC capacity of <br /> the solar project, lists all model numbers/quantities for the equipment used in the preliminary designs, and displays <br /> the estimated annual/monthly energy generation in kilowatt-hours (kWh).A comparison of electricity consumption at <br /> the site to the solar PV system output will be provided. The location and layout of the solar project, as well as the <br /> shading analysis is shown in the report.The CO2 offset from the solar PV system will be provided. <br /> 6) Structural Analysis of Proposed PV Systems—Solar layouts will be provided to NV5 along with the dead-load weight <br /> of the solar PV system, as well as any existing structural drawings that are available. NV5 will conduct a site visit to <br /> evaluate the roof framing structure to determine whether the roof has the structural capacity to safely support the <br /> proposed solar system. If the assumed system increases the force in the structural supporting elements by more than <br /> ten (10) percent, NV5 will provide general strengthening recommendations. Following the visit, NV5 will provide a <br /> certified report summarizing the findings,assessing the conditions of the roof structure, and making recommendations <br /> for each building. <br /> 7) Project Budgeting-Each project will be estimated via line-item estimate.The budgets will include the estimated costs <br /> for continued design-development, interconnection with utility, construction,and construction administration. <br /> 8) Financial Analysis—After completing project estimating and system design details (including annual production and <br /> the applicable utility rate schedule), we will complete a financial analysis that includes the applicable incentives for <br /> each project and aggregated portfolio. The metrics for financial analysis include Net Present Value (NPV), Internal <br /> Rate of Return (IRR) and Levelized Cost of Energy (LCOE). Operation and Maintenance costs, facilities service <br /> upgrades(where applicable)and interconnection costs will also be included in the financial analysis. We will work with <br /> County and Town staff to prioritize which projects are most beneficial and likely to have the best return on investment. <br /> 9) Compiled Feasibility Report — Once the feasibility studies are complete, we will compile our findings into a <br /> comprehensive report and present it to County and Town Staff. <br /> 10) Meetings—Meeting with owner as required at key milestones to present findings. Progress report emails will be sent <br /> to staff members every two weeks. <br /> 11) Pricing-Valid for 30 days. <br /> 12) Any changes in scope are excluded from Basic Services. <br /> Orange County Fees-The lump sum fee for the basic services above, excluding reimbursables expenses is: <br /> Eighty-Eight Thousand Four Hundred Sixty Dollars........................................................................$88,460 <br /> Town of Hillsborough Fees-The lump sum fee for the basic services above, excluding reimbursables expenses is: <br /> Twenty-Three Thousand Two Hundred Sixty Dollars........................................................................$23,460 <br /> Payment Terms—Project will be invoiced monthly for the project's work in progress. Payment is due Net 30 from date <br /> of the invoice. Should the project be postponed, put on hold, canceled,or delayed, payment for any services provided <br /> will be due. Please be advised that a fee may be incurred if the project is put on hold or reactivated later. <br /> Additional Services—Upon mutual agreement,we may provide services not listed in this proposal or items excluded <br /> per the hourly rate schedule provided below, unless a specific fee is proposed and agreed upon before work on the <br /> additional service begins.Additional services include, but are not limited to, the following: <br /> • Changes in scope during the feasibility study. <br /> • Revisions, alternates, or changes to the preliminary solar PV system designs. <br /> • Detailed design of any reinforcement to existing structures. <br /> • Eno River Parking Deck—Following completion of the feasibility study,additional design services are available <br /> to develop the solar canopy structural design.The structural drawings will contain plan views,elevations with <br /> Solar •.. _ <br />