Orange County NC Website
6 <br /> PURPOSE <br /> • Review design options and associated project budgets for the Crisis <br /> Diversion Facility <br /> • Select a preferred option <br /> • Direct the Manager to finalize the design with the architect and <br /> construction manager in order to prepare a guaranteed maximum <br /> price (GMP) for Board consideration in late 2025 <br /> ORANGE COUNTY <br /> NORTH CAROLINA <br />