Browse
Search
Agenda 10-21-2025; 6-a - Review of Design Options for the Crisis Diversion Facility
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2025
>
Agenda - 10-21-2025 Business Meeting
>
Agenda 10-21-2025; 6-a - Review of Design Options for the Crisis Diversion Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2025 11:49:21 AM
Creation date
10/16/2025 1:41:55 PM
Metadata
Fields
Template:
BOCC
Date
10/21/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda for October 21, 2025 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 10-21-2025 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> FINANCIAL IMPACT: No additional funding is necessary at this time. However, if a design option <br /> is selected above the current project budget, additional funding would be needed when the Board <br /> is presented with the guaranteed maximum price in late 2025. <br /> ALIGNMENT WITH STRATEGIC PLAN: This item supports: <br /> • GOAL 2: HEALTH COMMUNITY <br /> OBJECTIVE 1. Improve harm reduction, prevention, and support services for adults and <br /> children experiencing behavioral health issues, substance use disorder, and intellectual or <br /> developmental disability. <br /> OBJECTIVE 4. Reduce impacts and barriers for justice-involved children and adults <br /> through deflection, diversion, therapeutic interventions, and re-entry support, including <br /> housing. <br /> RECOMMENDATION(S): The Manager recommends that the Board: <br /> 1.) Select an option from the alternative design options; and <br /> 2.) Direct the Manager to finalize the design with the architect and construction manager in <br /> order to prepare a guaranteed maximum price (GMP) for Board consideration. <br />
The URL can be used to link to this page
Your browser does not support the video tag.