Orange County NC Website
25 <br /> MANAGER'S RECOMMENDATION <br /> • Select an option from the alternative design options; and <br /> • Direct the Manager to finalize the design with the architect and <br /> construction manager in order to prepare a guaranteed maximum <br /> price (GMP) for Board consideration. <br /> ORANGE COUNTY <br /> NORTH CAROLINA <br />