Browse
Search
Agenda 10-21-2025; 6-a - Review of Design Options for the Crisis Diversion Facility
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2025
>
Agenda - 10-21-2025 Business Meeting
>
Agenda 10-21-2025; 6-a - Review of Design Options for the Crisis Diversion Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2025 11:49:21 AM
Creation date
10/16/2025 1:41:55 PM
Metadata
Fields
Template:
BOCC
Date
10/21/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda for October 21, 2025 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 10-21-2025 Business Meeting
ORD-2025-035-Approval of Amendments to the Orange County Code of Ordinances Section 28 – Personnel Regarding Law Enforcement Special Separation Allowance
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
OTHER-2025-094-Memorandum of Understanding Between Orange County and Town of Hillsborough for the Solar feasibility study
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-096-Authorization for County Manager to Sign the State Bureau of Investigation Non-Criminal Justice Access Agreement
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
RES-2025-053-Public Hearing and Resolution for Orange County to Participate in the North Carolina commercial property
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2025
RES-2025-054-Approval of Amendments to the Orange County Code of Ordinances Section 28
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Design Option B.2. 18 <br /> Option B.I . with decreased BHUC bays from 12 to 6 <br /> BHUC <br /> exuc axsx7 <br /> PPLt xxs7ar xFG/7fCU[xY MSCNAxcP A1AM 7P9 <br /> lag 1vss 9nss m9ss noss <br /> Building Size exueoxsxv �'�W"xQ1G COMMUNITY <br /> Pe7,ulma us mss LLT <br /> 15,000 sf 101 <br /> EXPANSION <br /> 9 1167E 715E <br /> 1,200 SF <br /> COIWx1/ 1 79 I�F <br /> SBISOlT 11 <br /> xOAxP OIxfE 7COIOiIxi <br /> Cost Estimate �. <br /> $24,980,984FBC <br /> NUCIRV NIRSE 7W] <br /> Ofgft MAQ MAS PAnssstDe 741L':-. <br /> Ili] <br /> l49 ln9 <br /> Ri/SXWx PAix00A1 PAT xOOAY PAixOOM PATYOOM <br /> Future Community Addition xue __]L <br /> ss 1315P 319 ,3,9 <br /> xDOCAIP07 N/AIPIx MAxO mnxn <br /> $842,526 �° �� u9 519 PaAU PMYLr <br /> Ing <br /> uss ssAwN Mne � nel�wiRPs,x <br /> 169 % FIE' <br /> FBC Beds: 16 no<XM®/5tD W RMFIIdA[ A9 MSP Rr/Sxwx PR121x00M PA Y1�pM PI]1x00M PR 2�AOOMJ <br /> BHUC Bays: 6 c04Ugl uss „ 0115 219 BO <br /> 9160NT mxixx <br /> a•sP <br /> (2 Pediatric,4 Adult) °"uc°°'" uDxOxr GM" <br /> ab Y 1909 <br /> exuc BE[ AIPG, � P59[ wA119xIG <br /> xXUC a15x7 wWPPOOM tog IM9 )99 ,q,y vlCPel <br /> NSf 11x 5P ��� <br /> Dual-Side Entry "" <br /> FBC Requested Room Count <br /> n9 <br /> C.RIIxITAm <br /> BHUC Requested Bay Count <br /> PArxooAl WPATxOOW <br /> FBC Courtyard 1119 1319 <br /> Conference Space Other: • Reduced S F by 30% [PA:1 is19 <br /> Peer Living Split Entrance Vestibules,Some Side <br /> Resource Center Squared up building architecture PATxaoAl PAT NOW - <br /> 1919 1319 <br /> County Offices/Discharge Reduced Parking from 50 to 40 <br /> • 25% Decrease of Underground Stormwater Retention1711 SP1A <br /> • Added space for Community Offices and Discharge <br />
The URL can be used to link to this page
Your browser does not support the video tag.