Browse
Search
OUTBoard Oct 20, 2025
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2025
>
OUTBoard Oct 20, 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2025 4:43:51 PM
Creation date
10/13/2025 4:41:05 PM
Metadata
Fields
Template:
BOCC
Date
10/20/2025
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NCDOT DIV 7 PROJECTS LOCATED IN TWTPO - UNDER DEVELOPMENT <br /> TIP/WBS# Description LET/Start Completion Cost Status Project Lead <br /> Date Date <br /> 1-3306AC 1-40 at NC 86- Upgrade to superstreet from Northwood 1/19/2027 FY2029 $10,970,000 Planning and design activities underway Radha Attaluri <br /> Drive to Ramp C/D at 1-40 interchange <br /> HS-2407H 61 signalized intersections. Upgrade traffic signals and 3/18/2027 9/18/2028 $350,000 Planning and design activities to begin Dawn McPherson <br /> intersections with pedestrian accommodations. (Chapel soon. Project will be let for bidding. <br /> Hill) Signal Programming changes only. No <br /> construction. <br /> C-5650 Construct sidewalk on one side of SR 1919(Smith Level 4/8/2027 FY2029 $2,749,000 Carrboro approved to incorporate water Alex Stankovic <br /> Road/S. Greensboro St.)from Public Works Drive to the line work into design. Env doc returned w <br /> northern end of Old Pittsboro Road in Carrboro comments on 12/10/21. Document to be <br /> updated to include additional limits for <br /> resurfacing. NCDOT waiting on revised <br /> BP7-R013 Replace Bridge#90 on SR 1940(Damascus Church Road) 4/23/2027 FY2030 $2,220,000 Planning and design activities underway Daniel Dagenhart <br /> Plans at 25% <br /> P-5701 B Construct Platform, Passenger Rail Station Building at 6/30/2027 FY2028 $7,200,000 Planning and design activities underway. Matthew Simmons <br /> 46395.1.1 Milepost 41.7 Norfolk Southern H-line in Hillsborough <br /> 46395.3.3 <br /> HS-2407 G 18 signalized intersections. Upgrade traffic signals and 9/16/2027 3/16/2029 $1,610,000 Planning and design activities to begin Dawn McPherson <br /> intersections with pedestrian accommodations. (Chapel soon.This project entails actual <br /> Hill, Carrboro) construciton not just re-programming. <br /> B-6037 Replace Bridge#49 over Norfolk Southern Railway on NC 6/20/2028 FY2032 $14,080,000 Planning and design activities underway. Brandon Green <br /> 86 25% Plans complete. <br /> EB-5890 Construct sidewalk on Barnes Street from King Street to 9/7/2028 FY2030 $740,000 Municipal agreement needs to be Alex Stankovic <br /> SR 1005 (Jones Ferry Road) in Carrboro requested and executed to begin work. <br /> Page 3 TWTPO October 2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.