Orange County NC Website
NCDOT DIV 7 PROJECTS LOCATED IN TWTPO - UNDER DEVELOPMENT <br /> TIP/WBS# Description LET/Start Completion Cost Status Project Lead <br /> Date Date <br /> SS-6207T Portions of Twenty-One (21) Routes. Curve Warning Sign 9/20/2023 10/31/25 $200,000 Planning and design activities underway. Dawn McPherson <br /> 51112 Installation. Construction started.A few more Signs <br /> left to install. <br /> SS-6207A NC 54 Pedestrian improvements between SR 1902 2/15/2024 8/21/2025 $171,000 Planning and design activities underway. Dawn McPherson <br /> 50337 (Manning Drive)and SR 1937 (Old Fayetteville Road)in Materials have arrived and work been <br /> Chapel Hill and Carrboro. Improvements will include completed. Final inspection pending. <br /> refuge islands, crosswalks and pedestrian signals. <br /> Improvements to be completed by state forces. <br /> SS-6207BA 1-40EB/1-85 NB Ramps at SR 1226; 1-40WB/1-85SB Ramps 10/1/2025 10/1/2026 $400,000 Multiple signing and pavement marking Dawn McPherson <br /> 52040 at SR 1226; 1-40EB/1-85 NB Ramps at SR 1158; 1-40WB/1- upgrades recommended by the Wrong <br /> 85SB Ramps at SR 1158; 1-40EB/1-85 NB Ramps at NC Way Driver Road Safety Review. See <br /> 62; 1-40WB/1-85SB Ramps at NC 62; 1-40EB/1-85 NB spreadsheet included in the project <br /> Ramps at NC 49; 1-40WB/1-85SB Ramps at NC 49; 1- submittal package describing the signing <br /> 40EB/1-85 NB Ramps at NC 87; 1-40WB/1-85SB Ramps at and pavement marking improvements to <br /> NC 87; 1-40EB/1-85 NB Ramps at NC 54; 1-40WB/1-85SB be included in the project. State funds <br /> EB-5721 Upgrade existing off-road path and construct new section 12/1/2025 FY2026 $2,700,000 Bids opened 7/17/23-Bids rejected. Alex Stankovic <br /> of path of Bicycle Route#1 from Cleland Drive to Willow Project on Hold. Chapel Hill has secured <br /> Drive in Chapel Hill additional funding to relet at a future date. <br /> Final Plan comments addresses however <br /> due to tropical storm damage needs <br /> BP7-R009 Replace Bridge#11 on SR 1336(Halls Mill Road) 2/19/2026 FY2029 $2,900,000 Planning and design activities underway Daniel Dagenhart <br /> ROW acquisisition complete. <br /> HL-0045 Repair Bridge#241 on Exchange Park Lane over Eno 3/19/2026 FY2028 $153,800 Agreement executed, Hillsborough to Alex Stankovic <br /> River from South Churton Street to Faribult Lane in prepare environmental documents and <br /> Hillsborough plans. Review of final plans complete. CE <br /> submitted.Waiting to secure funding <br /> from Town. <br /> HS-2007H SR 1009 (Old NC 86)at SR 1727 (Eubanks Road) near 4/2/2026 FY2028 $153,000 Planning and deisgn activities underway. Trung Nguyen <br /> 49317.1.9 Chapel Hill. Right Turn Lane Modifications. Currently finalizing ROW plans. <br /> 49317.2.9 <br /> 49317.2.10 <br /> 49317.3.9 <br /> HO-0013 Chapel Hill from Franklin Street and Rosemary Street, and 5/12/2026 FY28 $2,100,000 Project approved by BOT and assigned. Alex Stankovic <br /> 51177.1.1 the streets in between from Merritt Mill Road to Henderson Municipal agreement executed. <br /> 51177.2.1 Street in downtown Chapel Hill. Install new mast arm and <br /> 51177.2.2 <br /> 51177.3.1 curb and sidewalk improvements. <br /> Page 1 TWTPO October 2025 <br />