Browse
Search
OUTBoard Oct 20, 2025
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2025
>
OUTBoard Oct 20, 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2025 4:43:51 PM
Creation date
10/13/2025 4:41:05 PM
Metadata
Fields
Template:
BOCC
Date
10/20/2025
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NON-STIP PMP <br /> August 5, 2025 <br /> Project ID11 Facility From To I&Description A <br /> Non-STIP Request Non-STIP Status <br /> Hwy-013 Buckhorn Road Orange Grove Rd Bradshaw Quarry Rd Upgrade the current unsurfaced HMIP Submitted (April <br /> 20-foot cross section to a surfaced, NCDOT Quarterly) <br /> 24-foot cross section suitable for <br /> L-F public traffic use. <br /> Hwy-014 Arthur Minnis Dodsons Cross Rocky Ridge Rd Upgrade the current unsurfaced HMIP Submitted(April <br /> Road Rd 20-foot cross section to a surfaced, NCDOT Quarterly) <br /> 24-foot cross section suitable for <br /> public traffic use. <br /> Hwy-023 Lebanon Road Mill Creek Road Efland-Cedar Grove Intersection and safety SPOT Safety Submitted (April <br /> Rd improvements along Lebanon Road NCDOT Quarterly) <br /> Hwy-036 Orange High Ann Road Orange Middle School Add a right-turn lane on Orange SPOT Safety Submitted (April <br /> School Road entrance High School Road NCDOT Quarterly) <br /> Hwy-038 New Hope Church New Hope New Hope Elementary Add a right-turn lane on New Hope SPOT Safety Submitted (April <br /> Road Elementary School western Church Road to New Hope NCDOT Quarterly) <br /> School driveway Elementary School <br /> eastern driveway <br /> Hwy-039 West Ten Road Gravelly Hill 300 ft east Extend the right-turn lane on West SPOT Safety Submitted (April <br /> Middle School Ten Road by 300 ft NCDOT Quarterly) <br /> Int-206 Buckhorn Road/ - - Intersection Improvements SPOT Safety Submitted (April <br /> Industrial Drive NCDOT Quarterly) <br /> Int-207 Ben Wilson Road/ - - Intersection Improvements SPOT Safety Submitted(April <br /> Bowman Road NCDOT Quarterly) <br /> t-208 Buckhorn Road/ - - Intersection Improvements SPOT Safety Submitted(April <br /> West Ten RoadU NCDOT Quarterly) <br /> Int-209 SR 1005 (Old - - B-5348. Replace Bridge 670085 Bridge Replacement Submitted (April <br /> Greensboro Road) over Phil's Creek NCDOT Quarterly) <br /> Int-210 NC 86 - - B-6037. Replace Bridge 670049 Bridge Replacement Submitted(April <br /> over North Carolina Railroad/ NCDOT Quarterly) <br /> Norfolk Southern Railroad <br /> OUTBoard/SRTS Old NC 86/Arthur Intersection Improvements SPOT Safety Submitted(April <br /> Minnis NCDOT Quarterly) <br /> OUTBoard/SRTS Orange Grove Intersection Improvements SPOT Safety Submitted(April <br /> Road/Davis Road NCDOT Quarterly) <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.