Browse
Search
OUTBoard Oct 20, 2025
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2025
>
OUTBoard Oct 20, 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2025 4:43:51 PM
Creation date
10/13/2025 4:41:05 PM
Metadata
Fields
Template:
BOCC
Date
10/20/2025
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
���E ORANGE COUNTY GOVERNMENT <br /> ORANGE ORL TRANSPORTATION SERVICES DEPARTMENT ri <br /> ,� <br /> NoKrH CARQLLNA Orang;„8�,�,u„5nt <br /> Item 5.b. <br /> Subject: Non-STIP Project Management Plan <br /> Attachment: Non-STIP PMP <br /> PURPOSE: To approve the Non-State Transportation Improvement Program Project <br /> Management Plan (PMP). <br /> BACKGROUND: <br /> October 2018— Program Launch: Small Transportation Projects <br /> Orange County regularly has opportunities to seek funding from the North Carolina Department <br /> of Transportation (NCDOT) for small-scale transportation improvements. These opportunities <br /> arise throughout the fiscal year and are typically supported by the following funding programs: <br /> • High Impact— Low Cost Project Program <br /> • Maintenance Resurfacing Program <br /> • Spot Safety Program <br /> Given the often-short timeframe between NCDOT's announcements and submission deadlines, <br /> County Planning staff request OUTBoard members to actively identify and report small-scale <br /> transportation needs they observe while traveling throughout the County. Maintaining an <br /> ongoing list of candidate projects allows the County to respond promptly and strategically to <br /> funding opportunities. <br /> • Typical Project Types Include: <br /> • Intersection improvements and radius adjustments <br /> • Minor widening and geometric modifications <br /> • Shoulder widening to improve visibility and safety <br /> • Operational enhancements and curve improvements and turn lanes <br /> • Traffic signal upgrades and signage enhancements <br /> Projects are generally prioritized based on crash history, congestion issues, pedestrian/school <br /> proximity, and local needs. A Safety Oversight Committee (SOC) evaluates and recommends <br /> eligible projects for consideration by the NCDOT Board of Transportation (BOT). <br /> January 2023—Program Evolution: Renamed as Non-STIP and Expanded <br /> In 2023, the program was renamed to the Non-STIP Small Transportation Project List to reflect <br /> its broader scope and improved coordination with NCDOT. The list is reviewed bi-annually by <br /> OUTBoard, in alignment with expanded program eligibility that includes: <br /> • Hazard Elimination Program <br /> • SPOT Safety and Mobility Programs <br /> • Highway Maintenance Improvement Program (HMIP) <br /> • Key Program Guidelines: <br /> • Projects must not require right-of-way acquisition. <br /> 600 Hwy 86 N - Hillsborough, North Carolina 27278 <br /> Phone (919)245-2008 - Fax (919) 732-2137 <br /> orangecountync.gov/transportation <br />
The URL can be used to link to this page
Your browser does not support the video tag.