Orange County NC Website
52 <br /> Figure 4.4.Potential Growth Areas <br /> Sewer Capacity Connection to Land Use Plans <br /> The Town's Comprehensive Sustainability Plan t <br /> recommendations: is <br /> • Reduction of the Urban Service Boundary to <br /> prevent/reduce sprawl and encourage ro - <br /> consolidated infrastructure and easier <br /> system maintenance. This will impact the - <br /> WASAMPBA agreement and necessitate updates. <br /> • Adjusting the UDO during the re-write to include , <br /> by-right he <br /> through zoning for smaller lot ` M <br /> sizes, more density, and varied housing types to <br /> focus growth within town limits and encourage q; <br /> contiguous annexation -- <br /> a <br /> • gnfAcantt waW and sewer systelm <br /> Future alignment of the FLUM with Fig. 4.4 improvementsdependmgn„type„t , <br /> (Potential Growth Areas) This will impact the land usepmp„seeayateallableflow <br /> and capacity„f[nesystem. r, A <br /> COCA agreement and JPA with Hillsborough and 5-:� T.-fH➢Ab—gh {7 <br /> Orange County. This may also impact established <br /> EDD areas. <br />