A meeting was scheduled for Monday, December 13, 1965, at eleven o'clock a.m.
<br />with representatives of the State Highway Commission.
<br />The following resolution was moved, seconded, and unanimously passed:
<br />The following resolution was moved, seconded and unanimously passed with refer-
<br />ence to the special election called by resolution of the Commissioners for an elec-
<br />tion for a special tax in Colony Wood Fire District:
<br />NOW, BE IT THEREFORE RESOLVED by the Board of Commissioners for the County of
<br />Orange that the canvass for the special election heretofore called to be held on
<br />Tuesday, December 21, 1965, be and the same shall be held at 10:00 o'clock A.M.
<br />Thursday, December 23, 1965, and that this meeting is hereby adjourned sine die unti.
<br />that time.
<br />Harvey Bennett
<br />Chairman
<br />Betty June Hayes
<br />Clerk
<br />Monday, December 13, 1965
<br />The Orange County Board of Commissioners met in special session on Monday,
<br />December 13, 1965, at eleven o'clock a.m. in the Auditorium of the County Agricultur-
<br />al Building in Hillsborough, North Carolina.
<br />Members Present: Chairman Harvey D. Bennett, William C. Ray, Carl M. Smith, and
<br />Henry S. Walker.
<br />Members absent: Commissioner Gordon 3. Cleveland.
<br />The purpose of this meeting was to meet with representatives of the North Caro-
<br />lina State Highway Commission to inspect the proposed 1965-1966 Road Program for
<br />Orange County.
<br />Thomas S. Harrington, Division Commissioner, T. A. Burton, Division Engineer,
<br />Paul Welch, Earl F. Hoover, J. B. Taylor, and C. I. Walters, representatives of the
<br />State Highway Commission presented to the Board of Commissioners the following.1965-
<br />1966 Secondary Road Program for Orange County:
<br />NORTH CAROLINA STATE HIGHWAY COMMISSION
<br />1965-1966 SECONDARY ROAD PROGRAM
<br />ORANGE COUNTY
<br />1965-1966 Allocation
<br />Less 10% Reserve
<br />Balance 1965-1966 Funds
<br />Balance 1964-1965 Funds
<br />Total Funds Available
<br />Map Sec. Rd.
<br />No. No. Length
<br />$208,220.00
<br />20,822.00
<br />187,398.00
<br />2,403.36
<br />189,801.36
<br /> PAVING PROGRAM
<br />1 1709 0_7 Rock House Road
<br />2 1157 0.45 West Hillsborough Elementary School Road
<br />3 1933 0.61 'Cemetery Road
<br />4 1715
<br />1716
<br />1.8
<br />Crabtree Road
<br />5 1935 0.56 Weaver Street
<br />6 1945 1.9 Log Cabin Service Station Road
<br />7 1561 0.8 Lawrence Road
<br /> 6.82 Total Paving
<br /> STABILIZATION
<br />3 1551 2.6 Edmund Walker Road
<br /> Surveys
<br /> Total Funds Programmed
<br />Estimated
<br />$ 17,500.00
<br />10,900.00
<br />15,400.00
<br />43,300.00
<br />13,500.00
<br />37,000.00
<br />16,200.00
<br />$153,800.00
<br />8 26,000.00
<br />10,000.00
<br />$189;800.00
<br />Mr. Burton, Division Engineer, also presented a map showing the roads designated
<br />!n the 1965-1966 Secondary Road Program. Discussion ensued.
|