Browse
Search
Agenda - 02-17-2003-10a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 02-17-2003
>
Agenda - 02-17-2003-10a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 8:55:01 AM
Creation date
8/29/2008 10:44:10 AM
Metadata
Fields
Template:
BOCC
Date
2/17/2003
Document Type
Agenda
Agenda Item
10a
Document Relationships
Minutes - 20030217
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br />IV. Recommendations for Road Configuration <br />The Joint Orange Grove Road Transportation Group recommended several changes to the <br />Hillsborough Transportation Plan regarding proposed roadway sections. <br />Orange grove road is designated as a major urban thoroughfare with average daily traffic of <br />4,100 in 2001. The proposed cross section is a two-lane, 24-foot shoulder section within a 60- <br />foot right-of-way. Traffic projections in the corridor do not warrant widening the road since the <br />existing and proposed cross section has adequate capacity (14,000 ADT) to handle the <br />projected average daily traffic at level of service E. <br />Regional urban highway capacity figures are calculated at level of service E. Level of service <br />E represents operating conditions at or near the capacity level with reduced speeds and <br />difficulty maneuvering within the traffic streams. Operations at level of service E are usually <br />unstable because small increases in flow or minor perturbations within the traffic stream will <br />cause breakdowns. <br />This plan recommends a cross section for Orange Grove Road that will be adequate to operate <br />in the future at a higher level of service. <br />The new housing proposals in the Orange Grove Road corridor, all of which could be approved <br />by February 2003, have the potential of creating 4,400 (approximately) trips per day. Traffic <br />generated by the new high school at capacity (1,000 students) could easily create more than <br />1,0 trips per day during the school year. Traffic from the known development, combined with <br />existing traffic counts in the corridor, will outpace the traffic projected for 2020 in the 1997 <br />Transportation Plan for the Town of Hillsborough. That plan projects 8,300 average daily <br />traffic in 2020 and traffic generated by current development proposals may result in average <br />daily traffic over 9,000 within the next five years. <br />Recommended cross sections for Orange Grove Road are shown in Figure 1. Proposed Street <br />Cross Sections. The recommended cross sections include three shoulder sections (figures <br />1 a, 1 c and 1 d) and a curb and gutter section (figure 1 b). <br />The recommended shoulder sections require an 80-foot right-of--way to accommodate two 11' - <br />12' travel lanes with a bicycle lane, shoulder and drainage ditch in each direction. Two of the <br />shoulder sections and the curb and gutter section place 5' sidewalks outside the drainage and <br />utility areas which would allow construction of the sidewalks prior to widening the roadway for <br />bicycle lanes. Placement of pedestrian facilities in that manner, farthest from the travelway, <br />provides more separation between pedestrian and motor traffic and increases safety and <br />comfort level for all traffic. <br />
The URL can be used to link to this page
Your browser does not support the video tag.