Browse
Search
Agenda - 02-17-2003-10a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 02-17-2003
>
Agenda - 02-17-2003-10a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 8:55:01 AM
Creation date
8/29/2008 10:44:10 AM
Metadata
Fields
Template:
BOCC
Date
2/17/2003
Document Type
Agenda
Agenda Item
10a
Document Relationships
Minutes - 20030217
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18 <br />After technical report has been received by both the Hillsborough Town Board and the <br />Orange County Board of Commissioners, if the data indicates that construction of a <br />sidewalk on the north side of Orange Grove Road is not financially feasible, pursue <br />widening Orange Grove Road to 12' lanes with, at a minimum, 4' paved shoulders and <br />preferrably with 6' or 8' paved shoulders to allow for a shared bicycle/pedestrian <br />facility. <br />Coordinate with the School Board to pursue installation of sidewalks along Orange <br />Grove Road adjacent to the school property, along New Grady Brown School Road <br />and from the proposed cross walk on New Grady Brown School Road to the Grady <br />Brown School and to Cedar Ridge High School. <br />3. Implement recommendations into local plans and regulations. <br />Include recommendations in this study in the development of Multi-modal <br />Transportation Plans for Orange County and the Town of Hillsborough. <br />Adopt recommended cross section for Orange Grove Road into Orange County and <br />Town of Hillsborough zoning ordinances and subdivision regulations. <br />Amend each jurisdictions respective land use regulations to support and/or implement <br />recommendations in this study including a provision that any development having <br />ingress/egress off Orange Grove Road in the study area either construct its fair share <br />of recommended improvements or provide payment in lieu of for such improvments. <br />Support TIP Project R2825, South Churton Street improvements, by continuing to <br />assign a high priority to that project as a transportation need in the biennial update of <br />the TIP. <br />4. The following items are recommended for Future Studies. <br />Work with the business community through the Economic Development Commission <br />and the Orange County/Hillsborough Chamber of Commerce to implement the <br />recommendations in the Feasibility Study for South Churton Street concerning Daniel <br />Boone Village and to develop access management for other businesses in the South <br />Churton Street corridor. <br />Pursue a future study for the Oakdale Drive corridor. <br />5. Distribute Orange Grove Road Study and Access Management Plan to <br />community groups for comments. <br />
The URL can be used to link to this page
Your browser does not support the video tag.