Browse
Search
Agenda 10-07-2025; 5-a - Zoning Atlas Amendment – 3531 NC Highway 54 W, Chapel Hill, Bingham Township
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2025
>
Agenda - 10-07-2025 Business Meeting
>
Agenda 10-07-2025; 5-a - Zoning Atlas Amendment – 3531 NC Highway 54 W, Chapel Hill, Bingham Township
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2025 1:55:57 PM
Creation date
10/2/2025 2:51:11 PM
Metadata
Fields
Template:
BOCC
Date
10/7/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda for October 7, 2025 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 10-07-2025 Business Meeting
ORD-2025-031-Zoning Atlas Amendment – 3531 NC Highway 54 W, Chapel Hill, Bingham Township
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
OTHER-2025-084-Approval of Lease Renewal Amendment for IFC HomeStar
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-086-Approval of FY 2025-26 Animal Control Services Contracts with Towns of Carrboro, Chapel Hill and Hillsborough
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-087-Town of Chapel Hill Agreement
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-088-Town of Hillsborough Agreement
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-092-Statement of Consistency of a Proposed Zoning Atlas Map Amendment
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
PRO-2025-028-Disability Employment Awareness Month Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2025
PRO-2025-029-Domestic Violence Awareness Month Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2025
PRO-2025-030-4-H Week Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2025
PRO-2025-031-Fire Prevention Week Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2025
PRO-2025-032-Arts and Humanities Month Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2025
RES-2025-047-Refund-Release Resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2025
RES-2025-048-Refund-Release Resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2025
RES-2025-051-Resolution leasing property up to teen years
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2025
RES-2025-052-Resolution Naming the Cedar Grove Park Athletic Field #1 as the caoch Willie Lawrence Vanhook athletic field
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
65 <br /> EnvirotacticS <br /> An Earth Systems Company <br /> 5.0 GROUNDWATER MODELING <br /> Using the Proposed Community Well pump test data from 2024 and 2025, simple groundwater modeling may <br /> be performed using available tools from the North Carolina Department of Environmental Quality2: <br /> • Distance Drawdown Analysis: If we have drawdown measurements at various distances from a <br /> pumping center and want to estimate the transmissivity and storage coefficient of an aquifer <br /> • Reverse Distance Drawdown Analysis: If we know the transmissivity and storage coefficient of an <br /> aquifer and need to estimate how groundwater levels will respond with distance from the pumping <br /> center after some time has elapsed. <br /> • Time Drawdown Analysis: If we have drawdown measurements from one well over time at some <br /> distance from a pumping center and want to estimate the transmissivity and storage coefficient of <br /> an aquifer. <br /> • Reverse Time Drawdown Analysis: If we know the transmissivity and storage coefficient of an <br /> aquifer and need to estimate how groundwater levels will respond over time in a well at some <br /> distance from the pumping center. <br /> • Simple Finite Difference Model: If we estimate groundwater level drawdowns associated with a <br /> pumping center overtime (non-steady state solutions). <br /> As discussed in Section 2 of this report in greater detail, we determined through use of AQTESOLV3 (see <br /> below and Attachment 3) that the average aquifer Transmissivity is approximately 30 square feet/day; <br /> Hydraulic Conductivity is approximately 0.05 feet/day; and Storage Coefficient is approximately 0.06. <br /> 2024 Pump Test 2025 Pump Test <br /> ,000 Gbm W� <br /> oKG BEE -RnOBBEE <br /> Am W Me l AWft <br /> °no� Gmnli,mB ® CUII,K9 <br /> SenR;w, Sentiai <br /> ' Pmpmd°pubmLmmper � Aapatlq,tbs-Cmmin'. <br /> i'sateelers PiRl11lII <br /> A =28.83 fl2ldmy q e 3.49 <br /> 2flyy, <br /> 0.000 <br /> 5 =0.110I 3 =0.006208 <br /> rtw1=0.15]n ° r( 0.211 <br /> ° rtc7=0.42 n ° (c)=a 4 128 <br /> Ee 106 <br /> l <br /> 0 <br /> 1 10 100. 1000. 1.0E+9 ,0 <br /> Tm°e lmnl t. 10. 10a <br /> . t000. t.0Ea1 <br /> 2https://www.deq.nc.gov/about/divisions/water-resources/groundwater-resources/groundwater-management-data-tools-technical-reports <br /> 3 http://www.agtesolv.com/pumping test analysis htm#Variable_Rates <br /> Envirotactics, LLC Page 15 of 20 Groundwater Modeling Report <br /> (732) 449-0077 Project No.6704 <br />
The URL can be used to link to this page
Your browser does not support the video tag.