Orange County NC Website
159 <br /> 2. No applications have been received for other actions. <br /> 3. No public health concerns. <br /> Erosion Tyler Sliger <br /> Control Date: Staff: TsIiger(cD-orangecountync.gov <br /> 919-245-2582 <br /> 1. Based on the materials provided for the March 6, 2025 DAC meeting, there are 2 <br /> mapped stream features or other surface water features (e.g. ponds and/or wetlands) <br /> within the project's parcel boundaries. Regulated streams (if any) must comply with <br /> Section 6.13 of the Orange County Unified Development Ordinance (UDO). If applicable, <br /> the applicant must also comply with Section 2.20 of the UDO and submit a Buffer Use <br /> Authorization Certificate (BAC) application for disturbances inside the regulated stream <br /> buffer. <br /> 2. Based on the submitted materials, the project isn't proposing a stream crossing. If the <br /> project proposes a crossing and/or is disturbing the stream channel a Pre-Authorization <br /> Construction Notification (PCN) application will need to be submitted to the United <br /> States Army Corps of Engineers (USACE) for the scope of work and a USACE <br /> Jurisdictional Determination (JD) must be forwarded to Orange County staff. <br /> 3. Based on the information provided and for the proposed/assumed limits of disturbance, <br /> the project will need a Land Disturbance Permit (LDP). If this project requires a LDP the <br /> applicant must adhere to Sections 2.18, 2.19, and 6.15 of the UDO. Orange County <br /> strongly advises the applicant to submit an LDP upfront that accounts for the total project <br /> including the roads and lots. <br /> 4. Please add the following signature block to the Final Plat: <br /> A Land Disturbance Permit has/has not been approved for this subdivision. This <br /> certification is not a Land Disturbance Permit or an approval for Land Disturbance. <br /> Subsequent changes to this subdivision may affect the ability to obtain a Land <br /> Disturbance Permit and/or Stormwater Permit. <br /> Erosion Control Officer Date <br /> Please add the following note to the Final Plat: <br /> 5. Orange County Erosion Control and Stormwater Note: <br /> Orange County regulates: Land Disturbance (UDO Section 2.18); Stormwater <br /> Management (UDO Section 2.21); Impervious Limits (UDO Section 4.2); Stream Buffer <br /> buffers UDO Section 2.20); Floodplain Development(UDO Section 2.6); Watershed <br /> Protection (UDO Section 4.2), and High-Quality Water Zone areas (HQW) (UDO Section <br /> 4.2). Before building, installing, developing or land disturbing on any parcel or area <br /> within the subdivision, please contact the Orange County Erosion Control and <br /> Stormwater Division to determine which regulations may apply. Orange County strongly <br /> also advises the applicant to submit a Land Disturbance Permit (LDP) before final plat <br /> recordation to account for the total regulated disturbance(s), including any roads and lots <br /> within the subdivision area. If permanent Stormwater Control Measures (SCMs) are <br /> constructed to meet Stormwater Management requirements, then the SCM(s) may <br /> require the recordation of permanent stormwater maintenance easements and/or access <br /> easements (accessible via the nearest public right of way) to provide perpetual access to <br /> the SCM(s) for Orange County inspection. <br /> Fire and Life Chris Pendergrass <br /> Safety Date: 3/3/2025 Staff: cpendergrass orangecountync.gov <br /> 919-245-6125 <br />