Orange County NC Website
156 <br /> Attachment C <br /> Based on the Neighborhood Information Meeting feedback, the following changes were <br /> addressed on the plans or in process of being conducted: <br /> Y We have engaged a hydrogeologist with Spangler Environmental to study further water <br /> availability and existing and future demand in the area. <br /> Y Our traffic engineer, Josh Reinke, PE with Bolton & Menk, prepared a Trip Generation <br /> letter. NCDOT will review the study and determine if any road improvements, such as <br /> turn lanes, are necessary as we move forward to subdivision plat. It should be noted that <br /> NCDOT has received the Trip Generation Letter and a copy has been provided to <br /> Orange County Planning Department. <br /> ➢ Our team is deeply focused on delivering a community that blends well with the rural and <br /> natural characteristics of the region. We prepared and shared illustrations and <br /> schematics of the proposed community prepared by Rachel Cotter RLA, Nicole Steele <br /> PLA, Allison Gramolini RLA, CPSI, with Weston & Sampson Design Studio to specifically <br /> show our desire to maintain the historic, natural environment and the overall rural <br /> characteristic of the area. <br /> y Danielle Cabral, EI and Don Sever, PE with Bowman Engineering will continue to <br /> develop a stormwater design in accordance with County and State regulations. <br /> ➢ Forestar is reaching out to neighbors individually to address unique concerns raised in <br /> the meeting. <br /> 172382604.2 <br />