Orange County NC Website
JAQ <br /> 8. No less than 25 acres of Open Space areas shown on the Site Plan shall collective) include a <br /> p p Y <br /> total of: <br /> i. one (1) covered, open air structure similar to those shown on the attached Exhibit C in <br /> the general area identified as the "Community Building Structure" on the Site Plan; <br /> ii. at least two (2) grilling stations; <br /> iii. at least one (1) fire pit; <br /> iv. at least four (4) trash cans; <br /> V. at least four (4) pet waste stations; and <br /> vi. at least ten (10) bird nesting boxes in the general area identified as a "bird sanctuary" on <br /> the Site Plan, all to be maintained by the HOA. <br /> 9. Individual septic systems meeting Orange County requirements and designed to serve homes <br /> with four (4) bedrooms shall be provided on each residential lot. <br /> 10. Subject to NCDOT approval, the property owner shall provide a right-hand turn lane <br /> (deceleration) and a left-hand turn lane (center lane) into the property entrance on Highway 54 <br /> meeting NCDOT standards. <br /> Review Milestones <br /> Application Submittal Date February 7, 2025 <br /> Development Advisory Committee March 6, 2025 <br /> DAC Review <br /> Neighborhood Information Meeting April 29, 2025 <br /> NIM <br /> Note: The DAC is a staff/agency committee, established in Section 1.9 of the Unified <br /> Development Ordinance. <br /> Courtesy Review <br /> Jurisdiction Date Sent Comments Received (Y/N) <br /> State Clearing House February 18, 2025 Yes <br /> Orange Grove Volunteer Fire Department N/A Yes <br /> All comments received through Courtesy Review are available via the Permit Portal. <br /> Analysis <br /> Staff Analysis <br /> As required under Section 2.8.5 of the UDO, the Planning Director shall cause an analysis to be made <br /> of the application. In analyzing this request, the Planning Director offers a full analysis of the <br /> application's consistency with the adopted Orange County 2030 Comprehensive Plan. <br /> See the drafted Statement of Consistency (Attachment 6) in which the relevant Goals and Objectives of <br /> the Orange County 2030 Comprehensive Land Use Plan have been analyzed in full detail. <br /> 1. Staff review determined that the application is complete and all submitted materials are in <br /> compliance with the following applicable sections of the UDO: <br /> ■ Section 2.8, Zoning Atlas and Unified Development Ordinance Amendments <br /> ■ Section 2.9, Conditional Districts <br /> ■ Section 5.21.1(A), Standards for Major Subdivisions, Conditional Districts <br /> 7 <br />