Orange County NC Website
Environmental Protection and Climate Action 12 <br /> 1 .3 Solar Energy Generation <br /> 7.3 Increase the annual solar <br /> Solar Generated by County Facilities <br /> 4,000,000 energy generated at County <br /> facilities by 767% by June 30, <br /> m 3,011,619 KBTUs 3,011,619 KBTUs 2029. <br /> Y 3,000,000 - — — — — — — — — ♦ <br /> c <br /> 0 <br /> 2,217,652 KBTUs <br /> o ♦- Target The measure is currently on track to <br /> -C2,000,000 <br /> (3 ® Actuals meet its target by June 30,2029.The <br /> 0 <br /> 1,127,947 KBTUs County expects solar generation to <br /> w <br /> 1,000,000 increase due to recent and planned <br /> projects.The Efind EMS Station <br /> 0 <br /> recently completed its solar <br /> 0 <br /> installation,and we have secured <br /> Basel i ne(FY23-24) FY24-25 <br /> grant funding to install solar at the <br /> Cedar Grove Community Center.We <br /> plan to add solar to the Southern <br /> Human Services Center and the <br /> Drakeford Library Complex,and are <br /> conducting a solar feasibility study to <br /> help prioritize future projects. <br /> 1 .4 Vehicle Replacement <br /> 7.4 Replace 75%of County non- <br /> Replacement Vehicles that are Electric <br /> f6t responder vehicles(7-8 80 <br /> vehicles) each year with electric 7.- • <br /> or other alternative fuel w 75% <br /> 2 62% <br /> vehicles(blodiesel, ethanol, M 50 <br /> hydrogen, etc.). M <br /> ♦•Target <br /> t Actuals <br /> Out of 29 vehicles replaced in FY24- j 40 <br /> 25,18 are electric vehicles36 of the <br /> '2D8 vehicles in the 6avpy�e 0- <br /> N 23% <br /> electric vehicles. 0' <br /> 20 <br /> Baseline(FY23-24) FY24-25 <br /> Orange County Strategic Plan FY24-25 Progress Report Page 11 <br />