Browse
Search
Agenda 10-07-2025; 5-a - Zoning Atlas Amendment – 3531 NC Highway 54 W, Chapel Hill, Bingham Township
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2025
>
Agenda - 10-07-2025 Business Meeting
>
Agenda 10-07-2025; 5-a - Zoning Atlas Amendment – 3531 NC Highway 54 W, Chapel Hill, Bingham Township
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2025 1:55:57 PM
Creation date
10/2/2025 1:36:39 PM
Metadata
Fields
Template:
BOCC
Date
10/7/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda for October 7, 2025 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2025\Agenda - 10-07-2025 Business Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
70 <br /> EnvirotacticS <br /> An Earth Systems Company <br /> 6.0 CONCLUSIONS AND LIMITATIONS <br /> Based upon the data from the two (2) pump test data from September 11-12, 2024, and July 16-17, 2025, <br /> observed water levels within the three wells during time intervals in June and July 2025, and the analyses <br /> performed using the simple groundwater modeling tools from NC DEQ, we believe that use of the Proposed <br /> Community Well consistent with North Carolina regulations to serve the proposed residential development <br /> will not cause withdrawal impacts to the adjacent single use wells. <br /> This report has been prepared in accordance with the standard of care expected of professionals in the <br /> industry performing similar services on projects of like size and complexity at this time in the region.We have <br /> prepared this report for the purpose intended by our Client, and reliance on its contents by anyone other <br /> than our Client is done at the sole risk of the user. No other representations expressed or implied, and no <br /> warranty or guarantee is included or intended by this report.This report is limited to the specific project and <br /> project location described. The analyses and conclusions contained in this report are based upon the data <br /> obtained from the testing and monitoring performed from the groundwater wells indicated on the Well <br /> Location Map and other information as referenced in this report,where applicable.The study and associated <br /> conclusions rely upon specific information obtained at specific locations at specific times.This report does <br /> not reflect variations that can occur at other locations and/or at other times. <br /> Envirotactics, LLC Page 20 of 20 Groundwater Modeling Report <br /> (732) 449-0077 Project No.6704 <br />
The URL can be used to link to this page
Your browser does not support the video tag.