Browse
Search
Agenda 10-07-2025; 5-a - Zoning Atlas Amendment – 3531 NC Highway 54 W, Chapel Hill, Bingham Township
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2025
>
Agenda - 10-07-2025 Business Meeting
>
Agenda 10-07-2025; 5-a - Zoning Atlas Amendment – 3531 NC Highway 54 W, Chapel Hill, Bingham Township
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2025 1:55:57 PM
Creation date
10/2/2025 1:36:39 PM
Metadata
Fields
Template:
BOCC
Date
10/7/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda for October 7, 2025 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2025\Agenda - 10-07-2025 Business Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
113 <br /> Conclusion <br /> The proposed Rigsbee Subdivision development was reviewed to determine the trip generation <br /> potential for the site, the need for turn lanes into the proposed driveway, and expected capacity <br /> analysis at the proposed driveway. Per NCDOT and the County's requirements, the proposed <br /> development trips do not meet the thresholds to perform a TIA. Based on the NCDOT turn lane <br /> warrant methodology, turn lanes were not warranted for the proposed driveway along NC 54. <br /> Additionally, capacity analysis indicates that the proposed driveway is expected to operate at <br /> acceptable levels of service with minimal queueing. <br /> If you have any questions or concerns,please do not hesitate to contact me. <br /> Sincerely, <br /> Bolton &Menk,Inc. <br /> ,i'`�N C ASR <br /> 4. <br /> QSEAL : Y <br /> 039251 �..= <br /> 4/10/2025 <br /> Joshua Reinke,PE <br /> Traffic Project Manager <br /> Attachment: Preliminary Site Plan <br /> Build Peak Hour Traffic Figure <br /> Count Data <br /> Turn Lane Warrant Chart <br /> Synchro Capacity Analysis Reports <br /> SimTraffic Queueing Reports <br /> 4 <br /> Be iton&Menk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.