Orange County NC Website
Orange County Health Center <br />ENERGY EFFICIENT LIGHTING UPGRADE <br />COST, SAVINGS, AND PAYBACK ANALYSIS <br />Third Floor Housing Dept <br />Existing System Proposed Solution Savings Summary <br />KW Watts KW Watts KW KWH Annual Proposed KW$KWH$Maint Total Total <br />Qty Description Load Each Qty Description Load Each Saved Saved Hours Hours Savings Savings Savings Savings Cost <br />4 2x2 2T8 U-Tube Prismatic 0.22 55 4 2X2 2L LED TUBE RETROFIT 0.10 26 0.12 301.60 2600 2600 $0 $27 $11 $39 $7,225 <br />124 2x4 4T8 Recessed Prismatic 13.27 107 124 2X4 4L LED TUBE RETROFIT 5.95 48 7.32 19,021.60 2600 2600 $0 $1,712 $341 $2,053 $7,225 <br />4 1x4 2T8 0.22 55 4 4FT 2L LED TUBE RETROFIT 0.10 24 0.12 322.40 2600 2600 $0 $29 $7 $36 $7,225 <br />132 13.71 132 6.15 7.56 19,645.60 $0 $1,768 $359 $2,127 $7,225 <br />Rate Rate Reductions Savings <br />kWh $0.09000 19,645.60 $1,768.10 <br />kW $0.00 7.56 $0.00 <br />Total Building Summary Payback <br />Total Project Cost $7,225 2.33 <br />Shipping Recycle and Misc $294 <br />Estimated Rebate $-2,554 <br />Net Project Cost $4,965 <br /> <br />Energy Savings $1,768 <br />Maint Mtrl Savings $359 <br />Total Savings $2,127 <br />Docusign Envelope ID: 73815A84-8F24-48F3-87F6-02EE804F8E44