Orange County NC Website
Proposal for Façade Consulting <br />The Gateway Center <br />228 Churton St. <br />Hillsborough, NC 27278 <br />BECS #20250551 <br />August 27, 2025 <br /> <br /> <br /> <br />BECS is now a Lerch Bates Company <br />Firm License Number: P-2493 WeAreBECS.com · LerchBates.com • Perform periodic site visits during construction at milestones and/or hold points, or other times as needed, to observe <br />the progress of the Work, verify quantities of repair, and determine whether the Work is being performed in general <br />accordance with the Project Specifications. <br />Post Construction <br />• We will prepare a formal punch list following substantial completion and conduct a formal walkthrough with the Client <br />following the Contractor’s formal statement of completion. <br />• Assemble close-out documents, including a letter of substantial completion, contractor’s formal statement of <br />completion, and warranty information and guidelines, and submit them to the Client for the project records. <br />• Our services during construction are limited to those described in the scope of work, attached terms and conditions, and <br />those discussed in the A104 contract format for the roles of the Architect. We are not responsible for Contractor means <br />and methods, staging, access, shoring, bracing, safety, scheduling, in-house quality assurance, temporary protection, or <br />any other roles of the Contractor as defined by the A104 contract format and industry-standard documents. BECS is not <br />an “owner’s representative,” “construction manager,” “construction project manager,” or “construction manager at <br />risk”; our involvement during construction is that of reviewing the Contractor’s work for conformance with the project <br />manual, drawings, industry standards, and the design intent. <br />• This will complete BECS’s Quality Assurance Services for the project. <br /> <br /> <br />Consulting Fees and Payment Terms <br />Task 1 – Forensic Evaluation of Building Envelope <br /> <br />Two to Three partial days on site performing the assessment and testing. After hours air infiltration testing to <br />utilize blower doors may be necessary. $12,160 <br /> <br />Aerial Lift: Two days $700/day; $1,400 <br />Contractor Support for Investigative Probes: $2,500 <br />$16,060 <br />Task 2 – Design Documents TBD <br />Task 3a – Bidding Services TBD <br />Task 3b – Permitting (Time and Expense) TBD <br />Task 4a – Quality Assurance Services TBD <br /> <br /> <br />Schedule <br />BECS will endeavor to complete the contracted work within a mutually agreed -upon timeframe with the Client. The <br />construction completion timeframe may be impacted by items beyond our control, including, but not limited to, contractor <br />availability, weather, and the permitting process. BECS will promptly complete those items within our control in the scope <br />of service. Items beyond our control shall not be considered delays on BECS's part. When the proposal is approved, BECS <br />will add this work to our staffing place and begin the project based on our present workload. <br />Docusign Envelope ID: FC887B74-13D0-4575-BB1C-E4A9D8E29E85