Browse
Search
2025-529-E-AMS-Siemens Industry-PNW Controls for HP3
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-529-E-AMS-Siemens Industry-PNW Controls for HP3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2025 1:23:23 PM
Creation date
9/18/2025 1:23:17 PM
Metadata
Fields
Template:
Contract
Date
8/26/2025
Contract Starting Date
8/26/2025
Contract Ending Date
8/27/2025
Contract Document Type
Contract
Amount
$8,012.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Smart Infrastructure <br /> <br /> <br /> <br /> <br />Orange County EMS Project - Siemens Change Order Proposal <br /> <br />1 of 2 <br /> Siemens Industry, Inc. <br /> Smart Infrastructure Division <br /> 4242 Six Forks Rd, Suite 1400 <br /> Raleigh, NC 27509 <br /> USA <br /> Tel.: (919) 469-5095 <br /> Fax: (919) 469-9846 <br /> www.usa.siemens.com <br /> <br /> <br />Working together for a Compliant Solution <br /> <br />PROPOSAL SUBMITTED TO PROJECT INFORMATION <br />COMPANY: Orange County Asset Management PROPOSAL DATE: 08/11/25 QUOTE ID: 77247fa2-f943-4675- <br />8a9d-d56e40bea7aa <br />CONTACT: Angel Barnes JOB NAME: Orange County EMS <br />ADDRESS: 306 Revere Road A102 ADDRESS: 510 Meadowlands Dr <br /> Hillsborough, NC 27278 Hillsborough, NC 27278 <br />PHONE: (919) 610-8182 FAX: ENGINEER: PDC <br />EMAIL: abarnes@orangecountync.gov DATE OF PLANS: N/A INCLUDED <br />ADDENDA: N/A <br /> <br /> <br />Angel, <br /> <br />This proposal will provide the labor and material needed for Demoing the existing Honeywell home system and <br />reconfiguring the control strategy for HP3 to be completely under Siemens control. <br /> <br />This price is good for 30 days from the date of this letter and work will not begin until the change order <br />subcontract is received. <br /> <br />All work will be conducted during normal operating hours M-F. Scope of work will not be in the base timeline <br />scope, additional time will need to be added to the schedule to accommodate this change. <br /> <br />Material pricing includes shipping, taxes, and warranty if applicable. <br /> <br /> <br /> <br /> <br /> <br /> <br />Breakdown Summary Includes: <br /> <br />• Demo existing Honeywell controls. <br />• Reconfigure the control strategy for HP3 to be completely under Siemens control. <br />• Engineering to update As-builts. <br />• Coordination and management to execute the additional scope. <br /> <br />Total Price: $ 8,011.50 <br /> <br /> <br /> <br />Docusign Envelope ID: 3E2268ED-60D0-44A7-A216-A2F04F5450DC
The URL can be used to link to this page
Your browser does not support the video tag.