Orange County NC Website
3 <br /> Proiect Budget: <br /> Gilbane, the Construction Manager at Risk, provided a budget estimate for the project in July 2025 <br /> of $25,700,000. That budget was incomplete as it did not include estimates for furniture, fixtures <br /> and equipment (FIFE) or owner's contingency. However, given the significant increase over the <br /> approved budget, the County asked CPL and Gilbane to provide several options for reducing the <br /> scope to ensure the project could stay within the approved budget. Please note that the cost <br /> figures below do not include the cost of land acquisition or professional services, which have <br /> already been encumbered or spent. <br /> Crisis Diversion Facility-Value Engineering Options <br /> Original Design Option A Option B Option B.1 Option C <br /> Building Square Footage 21,270 10,500 15,850 TBD 19,825 <br /> Core Services: <br /> BHUC Bays 12(8 Adult,4 Pediatric) 6(4 Adult,2 Pediatric) 12(8 Adult,4 Pediatric) 12(8 Adult,4 Pediatric) 12(8 Adult,4 Pediatric) <br /> FBC Beds 16 8 16 16 16 <br /> Features: <br /> Architectural Features' Yes <br /> Dual-Sided Entry Yes Yes <br /> FBC Courtyard Yes Yes Yes Yes Yes <br /> Coordinated Discharge Yes Yes Yes <br /> Conference Space Yes Yes <br /> Peer Living Yes Yes <br /> Resource Center Yes Yes <br /> Community Support Spaces Yes Yes <br /> Healing garden Yes Yes <br /> Overall Project Budget $ 28,347,044 $ 20,858,704 $ 25,490,277 $ 26,300,0003 $ 27,276,345 <br /> Changefrom Budget $ 5,862,160 $ (1,626,180) $ 3,005,393 $ 3,800,000 $ 4,791,461 <br /> Average Annual Debt Service $ 2,220,416 $ 1,663,248 $ 2,007,859 $ 2,068,106 $ 2,140,751 <br /> Changefrom Budget $ 436,173 $ (120,996) $ 223,616 $ 283,863 $ 356,508 <br /> Tax Increase for All Capital <br /> Projects in Debt Mode 14 9.63 9.501 9.581 9.591 9.61 <br /> Change from Budget 0.10 -0.03 0.05 0.06 0.08 <br /> Tax Impact on$400,000 Home $ 385.20 $ 380.00 1 $ 383.20 1 $ 383.60 1 $ 384.40 <br /> Change from Budget $ 4.00 $ (1.20)1 $ 2.001 $ 2.401 $ 3.20 <br /> Notes: <br /> 1.)Architectural features may include raised ceilings,large windows,and otherfacade and interior improvements. <br /> 2.) Coordinated discharge includes a conference room and several offices for County staff.Thesetypes ofspace are <br /> incorporated into the Original Design and Option C,but are broken outto showtheirinclusion in Option B.1 <br /> 3.) The project budgetforOption B.1 is not based actual estimates,but is only shown toil lustratethatthe likely cost is between <br /> Option B and Option C. <br /> 4.)Based on Incremental Increase Debt Model over10yearCapital Improvement Plan. <br /> FINANCIAL IMPACT: No additional funding is necessary at this time. However, if a design option <br /> is selected above the current project budget, additional funding would be needed when the Board <br /> is presented with the guaranteed maximum price in the Winter of 2025. <br /> ALIGNMENT WITH STRATEGIC PLAN: This item supports: <br /> • GOAL 2: HEALTH COMMUNITY <br /> OBJECTIVE 1. Improve harm reduction, prevention, and support services for adults and <br /> children experiencing behavioral health issues, substance use disorder, and intellectual or <br /> developmental disability. <br />