Browse
Search
Agenda 09-16-2025; 6-c - Review of Options for the Design of Crisis Diversion Facility
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2025
>
Agenda - 09-16-2025 Business Meeting
>
Agenda 09-16-2025; 6-c - Review of Options for the Design of Crisis Diversion Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2025 3:04:01 PM
Creation date
9/12/2025 3:06:26 PM
Metadata
Fields
Template:
BOCC
Date
9/16/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-c
Document Relationships
Agenda for September 16, 2025 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 09-16-2025 Business Meeting
ORD-2025-028-Article II State of Emergency
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
ORD-2025-029-Article III Noise
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
RES-2025-045-Amendments to the Emergency Management Ordinance – Second Consideration
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2025
RES-2025-046-Amendments to the Noise Ordinance – Second Consideration
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18 <br /> Design Option B.1 BHUC <br /> axu�a1sRv exec o�uRv �� eG/secvelr 1��`u�sF'' xux vas <br /> IYI SF <br /> BuildingSize "'SF <br /> exec l5eew exec onAv � � FUTURE COMMUNITY <br /> P®S rin5 P0.I IRAN5/9 IAA SF tY3F <br /> 17,435 s f <br /> REGIVIMENG <br /> COIAALI/ 0.513f <br /> INWFR sAxsGRr ixtARF 9NcxAAGe nr CM6uI7 <br /> 115E 9a SF ltd Sf 391 EP NSF 90.4 <br /> Cost Estimate <br /> $26,300,00 FBC <br /> IF <br /> MAQ aP0.R 50R FAC eN9COKe mucNo"t 1e SF YSF R5I!EA19SSi sIW/MEt19 IYSF IYlsf ����� <br /> Future Community Addition 2"� <br /> NRSHWS PAi ROOM PdS ROCM PA9 ROOM PAI ROOM <br /> 135E i113F I115F IRI SF 1113E <br /> $842,526 "" ^'+ <br /> to SF 015E 1 ' <br /> enAKE F233F <br /> e1WCOeSAY ex9C OeFR �� CNA11 I13Sf COMAIIr 1E%AM tM�S I/VI <br /> FBC Beds: 16 ]d5 76 SF /SMMR RC ARSESM ��a <br /> 945E V <br /> Slgl SIAFf RT <br /> BHUC Bays: 12 RPRICORS IXIICOISR SOIIWYAEO 7951 N5f N/55IYIR tMA00M tAtA00M 1A]AOOM F0.tA00M <br /> eUCa IAe SIARARFA3 /1 SF 121 SF I21A 1219E 1213E <br /> RSR 79 SF <br /> 1179E 31131 Ff9C <br /> (4 Pediatric,8 Adult) <br /> sruFn' nsf GN�GN <br /> m 'C v WAWN;5F <br /> Dual-Side Entry <br /> FBC Requested Room Count <br /> ni/5NWR 933E <br /> 933E <br /> BHUC Requested Bay Count CO MI7Am <br /> I,aa23f <br /> n1114�1'" � !eG 17F g{�A1 <br /> FBC Courtyard <br /> Conference Space other: Reduced SF by 18% FIAI.,— PAT <br /> Peer Living „ <br /> Split Entrance Vestibules,Some Side A sl <br /> Resource Center <br /> Squared up building architecture <br /> PAi ROOM PAT 900A9 <br /> Reduced Parking from 50 to 40 a,sF u3s <br /> Discharge Planning Conference Room 25% Decrease of Underground Stormwater Retention <br /> HealingGarden rA7 RGOM III <br /> IIF <br /> Added space for Community Offices and Discharge 111 s1 ,15s <br />
The URL can be used to link to this page
Your browser does not support the video tag.