Orange County NC Website
212 <br /> Orange County FTTP Project Schedule (5852 HHs) <br /> Nov-23 Jan-24 Mar-24 Jan-25 Jun-25 Mar-26 <br /> Director Network <br /> Project Punning Planning <br /> Director OSP <br /> Site Surreys Engineering <br /> Director OSP <br /> Easement Research Engineering <br /> Director IP <br /> Design Engineering Engineering <br /> Director OSP <br /> Permit Acquisition Engineering <br /> Director OSP <br /> DSP Fiber Build Construction <br /> Director OSP <br /> Site Preparation Engineering <br /> Director IP <br /> Equip Installation Engineering <br /> Director OSP <br /> Fiber Terminal Installs&Splicing Construction <br /> Director OSP <br /> Commercial Power Activatio n Engineering <br /> Director IP <br /> Equip Tum-up Engineering <br /> DirectorsIP&OSP <br /> - <br /> 11,000 Homes EngEneering <br /> Directors(IP&DSP) <br /> Phase 2 Market Launch(+1,000 Hemes) Engineering <br /> Directors IP g,OSP <br /> Phase 3 Market Launch[+1,000 Homes) Engineering <br /> Directors IP&OSP <br /> Phase 4 Market Launch[+1,000 Homes) Engineering <br /> Directors IP&DSP <br /> Phase 5 Market Launch(+1,187 HOMES) Engineering <br /> Directors IP&OSP <br /> Phase 6 Market Launch(+665 Homes) Engineering <br />