Orange County NC Website
AS <br />Draft 1/24/02 <br />Target Date BOCC/Town Consideration*: October 2004 <br />* - As per current proposed schedule. <br />Develop construction drawings and bids, gain Town site plan approval, <br />award bid to contractor(s) and construct the park facilities according to the <br />BOCC-adopted plan. <br />Estimated Cost $838,500 <br />Construction Project Commissioner Halkiotis <br />Team Commissioner Jacobs <br />County Manager (or designee) <br />Recreation and Parks Management Director <br />Purchasing Director <br />Open Space Design Specialist <br />County Engineer <br />ERC Director <br />Planning Director <br />Park Services Director <br />(Town staff if Joint Master Plan process) <br />BOCC Review of Construction Drawings October-Nov. 2004 <br />BOCC Bid Approval December 2004 <br />"Best-case" Construction Begins January 2005 <br />"Best-Case" Park Opening: November 2005 <br />Jction needed to Proceed at this time: <br />If the Board is ready to proceed with planning for this park: <br />1. Boards review site evaluation <br />2. Draft Memorandum of Agreement created and agreed to by both Boards <br />3. Boards agree to MOA and initiate project, adopt pre-concept plan and <br />scope of work <br />4. Appoint Fairview Park Master Plan Committee, with charge and mission <br />based on pre-concept plan and any operating principles the Board(s) <br />wish to apply.