Orange County NC Website
As <br />Draft 1/24/02 <br />Project Name: Fairview Park <br />Project Cost: $850,000 <br />Pre-Concept Plan Completed? No <br />Project Status: Existing playground and playing field. Decisions needed on 1) <br />whether park will include both County and Town of Hillsborough portions or <br />County only, 2) whether a joint County/Town park or a County park, and 3) <br />whether park plan will be folded into master plan for other public facilities at site. <br />Funds from 2001 bond, appropriated accordingly in 2002-2012 CIP, consistent <br />with following timetable. There is no pre-concept plan/. There was a 1986 <br />concept plan prepared. Interest expressed in Fall 2002 for joint County/Town <br />project. County and Town representatives met December 2002, staff asked to <br />nrenare site evaluation. <br />Scope of Work: Discuss outstanding issues with Town of Hillsborough. Receive <br />staff site evaluation. Develop Memorandum of Agreement on park plan. Form <br />Master plan committee to design park and any overall facility, using pre-concept <br />plan and operating principles adopted as part of the charge by the Board of <br />commissioners and ? own board 2. <br />ActivAy Resources <br />Estimated Cost $11,500 for detailed topographic and location survey) <br />Project Partners? Town of Hillsborough <br />Fairview Park Commissioner Jacobs <br />Concept Plan Committee Commissioner Halkiotis <br />Membership Hillsborough Town Commissioners <br /> 1 OC Recreation and Parks Advisory Council member <br /> 1 Hillsborough Parks and Recreation Board member <br /> 1 Commission for the Environment member <br /> _ Area Citizens <br /> 1 citizen design professional/ other expertise <br /> Additional members if a Master Plan Work Group? <br />Staff Resources Primary: County Manager (or designee), Open Space <br /> Design Specialist, ERC Director, Recreation and <br /> Parks Management Director, Town Manager (or <br /> designee) <br /> Other (Primary, if Master Plan approach selected): <br /> Land Conservation Manager, County Engineer, <br /> Planning Director (County and Town), Purchasing <br /> Director, Public Works Director <br />Town/County Work Group/ A (Process): December 2002 = August 2003 <br />Projected Master Plan Timetable*: October 2003 - September 2004