Orange County NC Website
a? <br />Draft 1/24/02 <br />Stage • and Construction <br />1. Develop construction drawings and develop RFP forbids <br />2. Present construction drawings to Board of Commissioners <br />3. Submit plans for approval (Site Plan Approval -Planning staff) <br />4. Solicit and review bids <br />5. Award bid to contractor(s) <br />6. Construct the Park facilities accordinm to the adopted plan. <br />Estimated Cost $248,000 <br />Construction Project Commissioner Halkiotis <br />Staff Team Commissioner Carey <br />County Manager (or designee) <br />Recreation and Parks Management Director <br />Purchasing Director <br />Open Space Design Specialist <br />ERC Director <br />County Engineer <br />Planning Director <br />Park Services Director <br />(Concept Plan Review Work Group kept apprised of <br />BOCC Review of Construction Drawings October 2003 <br />BOCC Bid Approval December 2003 <br />Possible Construction Begins January 2004 <br />Possible Park Phase II Opening: September-October, <br />2004** <br />** - Opening date estimate depends on what facilities are to be built <br />? Ction needed to Proceed at t4ij Jinw: <br />If the Board is ready to proceed with planning for this park: <br />1. Create Efland-Cheeks Park Plan Review Work Group, to review the <br />existing concept plan for the park for adequacy and changed <br />conditions, and amend as needed. Review letter from existing <br />community group about involvement. <br />2. Adopt operating principles and charge for Work Group, as needed.