Browse
Search
Agenda - 01-27-2003-3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 01-27-2003
>
Agenda - 01-27-2003-3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 11:24:39 PM
Creation date
8/29/2008 10:43:50 AM
Metadata
Fields
Template:
BOCC
Date
1/27/2003
Document Type
Agenda
Agenda Item
3
Document Relationships
Minutes - 20030127
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ao <br />Draft 1/24/02 <br />Project Name: Efland-Cheeks Park, Phase H <br />Project Cost: $250,000 <br />Pre-Concept Plan Completed? Yes <br />Project Status: A concept plan exists, as does Phase 1 of park. Funds from 2001 <br />bond, are designated accordingly in 2002-2012 CIP, originally planned to <br />develop nature trails, teaching platform and install field lighting. <br />Scope of Work: Review existing concept plan for adequacy and determine best <br />use of bond funds for park. Amend concept plan as needed. Look at sub-phase <br />potential for Phase 11 <br />Activfty Resources <br />Estimated Cost $2,000 <br />Project Partners? Orange County Schools <br />Plan Review Work Commissioner Halkiotis <br />Group Membership Commissioner Carey <br /> 1 Orange County School Board member <br /> 1 Recreation and Parks Advisory Council member <br /> 1 Commission for the Environment member <br /> 1 Habitat for Humanity representative <br /> Area Citizens <br />Staff Resources Primary: County Manager (or designee). Open Space <br /> Design Specialist, ERC Director, Recreation and <br /> Parks Management Director, Park Services Director <br /> Others as Needed: Land Conservation Manager, <br /> County Engineer, Planning Director, Purchasing <br /> Director, Public Works Director, others as needed <br />Possible Review Timetable*: Review existing plan, <br />March-June 2003 <br />Target Date for BOCC Consideration?*: August, 2003 <br />* - As per current proposed schedule.
The URL can be used to link to this page
Your browser does not support the video tag.