19 <br />Draft 1/24/02 <br />Stage 2 - Bids and Construction <br />Develop construction drawings and bids, gain County or Town site plan <br />approval, award bid to contractor(s) and construct the park facilities <br />according to the adopted plan as per BOCC approval. <br />Estimated Cost $1,190,000 (possibly in phases <br />Construction Project Commissioner Brown <br />Staff Team Commissioner Halkiotis <br />County Manager (or designee) <br />Recreation and Parks Management Director <br />Purchasing Director <br />Open Space Design Specialist <br />County Engineer <br />ERC Director <br />Planning Director <br />Park Services Director <br />(Concept Plan Committee is apprised of activity) <br />BOCC Review of Construction Drawings November 2003- <br />January 2004 <br />BOCC Bid Approval March 2004 <br />Possible Construction Begins Aril 2004 <br />"Best-Case" Park Opening Date: May-June, 2005 <br />Aai.. neectect t" Proceed at t4ie time: <br />If the Board is ready to proceed with planning for this park: <br />1. Adopt a pre-concept plan <br />2. Complete final actions needed to construct park. <br />3. Review timing/coordination of upgrades to Northern Human Services <br />Center as relates to park development <br />4. Discuss any interim measures the Board might wish to pursue at the <br />facility (opening of existing trail?) <br />5. Appoint Cedar Grove Park Concept Plan Committee, with charge and <br />scope of work (based on pre-concept plan and phasing potential) and <br />any operating principles the Board wishes to apply.