Orange County NC Website
Draft 1/24/02 1 8 <br />Project Name: Cedar Grove Park <br />Project Cost: $1.200.000 <br />Pre-Concept Plan Completed? Yes (reviewed but not adopted) <br />Project Status: Land acquired. Pre-concept plan reviewed by BOCC in June <br />2001 but not adopted. Funds allocated in 2001 bond, designated accordingly in <br />2002-2012 CIP. Project awaiting discussions with community groups before final <br />actions needed for park development are taken. <br />Scope of Work: Once adopted by BOCC, take pre-concept plan and <br />operating principles as part of the charge by the Board of <br />Commissioners (in addition to other guidelines to be added), to <br />design the park. Look at potential for phasing of park development. <br /> <br />Estimated Cost $10,000 for detailed topographic and location survey) <br />Project Partners? None <br />Concept Plan Committee Commissioner Brown <br />Membership Commissioner Halkiotis <br /> 1 Recreation and Parks Advisory Council member <br /> 1 Commission for the Environment member <br /> _ Area Citizens <br /> 1 citizen design professional/ other expertise <br />Staff Resources Primary: County Manager (or designee), Open Space <br /> Design Specialist, ERC Director, Recreation and <br /> Parks Management Director <br /> Others As Needed: Land Conservation Manager, <br /> County Engineer, Planning Director, Purchasing <br /> Director, Public Works Director <br />Projected Concept Plan Timetable*: <br />Target Date for BOCC Consideration*: <br />May-November. 2003 <br />November. 2003 <br />* - As per current proposed schedule