Orange County NC Website
34 <br /> c) Review the differences between watersheds and how that impacts what can be built or operate within <br /> them. (continued)Hyco <br /> Creek Non-Residential Impervious Surface <br /> j k Creak <br /> 1 49 <br /> Protected �3FIat River, <br /> i Protected ! <br /> X157 Area Limits <br /> ►E Little River 1, <br /> j Protected <br /> f <br /> I <br /> i Back Creek• <br /> Protect UppeEno Defined in UDO Section 4.2.6 <br /> r • <br /> Criticai 7 <br /> j7 <br /> j Towns have their own limits <br /> Critical Areas (CA) at 6% limit <br /> Upper Eno 1 <br /> Protected <br /> 70 Lower Eno Exceptions for fire stations and <br /> Low <br /> erEno Protected' p <br /> r Haw 70A solid waste collection centers (50%) <br /> j Creek - o -- 70 I <br /> The "10/70" rule is applied in our <br /> dal <br /> Cane Creek two Economic Development <br /> j Protected <br /> Districts (EDDs) <br /> Jordan Lake j <br /> t Cane Creek — � • <br /> Hillsborough Area EDD (50% max) <br /> Critical <br /> • Buckhorn-Mebane EDD <br /> l Water supply <br /> sa z l Watersheds <br /> Haw River <br /> University olI City Limits <br /> Lake <br /> Protected 0 ETJ <br /> University <br /> Haw River "Mae Impervious Surface Limits <br /> r+ Non-Residential <br /> Protected Criilcal Jordan Lake � ) <br /> Protected 1 <br /> 12% ORANGE COUNTY <br /> * Exception for Transition Nodes and EDDs. y 24% NORTH CAROLINA <br />