Orange County NC Website
DocuSign Envelope ID:32FCA70E-8C9D-4D85-AOBE-B88413353B8B <br /> 156 <br /> Orange County FTTP Project Schedule (6370 HHs) <br /> May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 Apr-23 May-23 Jun-23 Jul-23 Aug-23 Sep-23 Oct-23 Nov-23 Dec-23 Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 <br /> Director Network <br /> ProjeR Planning Planning <br /> Director OSP ------- <br /> SiteSurveys Engineering <br /> Director OSP ------- <br /> Easement gezearch Engine ring <br /> DireRor IP <br /> Design Engineering Engineering <br /> Director OSP <br /> Permit Acquisitlen Engineering <br /> Director OSP --�-- ■ <br /> OSP Fiber Build Constru4ion <br /> Director OSP ---_ ■_ <br /> Site Prepaatibn Engineering <br /> Director 0 <br /> Equip lnstallatton Engineering <br /> Director OSP <br /> Fiber Terminal lnstalk&Splicing Construction <br /> Director OSP <br /> Commercial Power Activation Engineering <br /> Director lP <br /> Equip Turn-up Engineering <br /> Directors IP&OSP <br /> Engineering <br /> DireRor,(IP&OSP) <br /> Engineering <br /> Directors(IP&OSP) <br /> Phase 3 Market Launch(+1,000 Homes) Engineering <br /> DireRor,(IP&OSP) <br /> Phase 4 Market launch(+1,000 Homes) Engineering <br /> DirectorsIP&OSP <br /> Phase 5 Market Launch(+1,000 Homesl Engineering <br /> Directors IP OSP <br /> Ph ase 6 Market Launch(+1,3]0 Homes] Engineering <br /> "'ProjeR Schedule based on Signed Contact Executed by June 30,2022 <br />