Browse
Search
Agenda 09-04-2025; 6-a - Amendment to the Network Development Agreement for Broadband Deployment with Lumos to Extend the Project Deadlines and Revise Passings
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2025
>
Agenda - 09-04-2025 Business Meeting
>
Agenda 09-04-2025; 6-a - Amendment to the Network Development Agreement for Broadband Deployment with Lumos to Extend the Project Deadlines and Revise Passings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2025 2:32:52 PM
Creation date
8/28/2025 2:14:39 PM
Metadata
Fields
Template:
BOCC
Date
9/4/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda for September 4, 2025 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2025\Agenda - 09-04-2025 Business Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
315 <br /> Orange County FTTP Project Schedule (5852 HHs) <br /> im 01ma— _. Jan-24 - Jun-25 <br /> Director Network <br /> Project Planning Planning 77 <br /> Director OSP <br /> Site Surveys Engineering <br /> Director OSP <br /> Easement Research Engineering <br /> Director IP <br /> Design Engineering Engineering <br /> Director OSP <br /> Permit Acquisition Engineering <br /> Director OSP <br /> OSP Fiber Build Construction <br /> Director OSP <br /> Site Preparation Engineering <br /> Director IP <br /> Equip Installation Engineering <br /> Director OSP <br /> Fiber Terminal Installs&Splicing Construction <br /> Director OSP <br /> Commercial Power Activation Engineering <br /> Director IP <br /> Equip Turn-up Engineering <br /> Directors(IP&OSP) <br /> ch <br /> Phase 1 Market Laun (1,000 Ho. Engineering <br /> Directors(IP&OSP) <br /> Phase 2 Market Launch(+1,000 Homes) Engineering <br /> Directors(IP&OSP) <br /> Phase 3 Market Launch(+1,000 Homes) Engineering <br /> Directors(IP&OSP) <br /> Phase 4 Market Launch(+1,000 Homes) Engineering <br /> Directors(IP&OSP) <br /> Phase 5 Market Launch(+1,187 Homes) Engineering <br /> Directors(IP&OSP) <br /> Phase 6 Market Launch(+665 Homes) (Engineering <br />
The URL can be used to link to this page
Your browser does not support the video tag.