Orange County NC Website
88 <br /> The applicant shall assess constructability of the required improvements and propose <br /> alternatives for consideration by the Department and local jurisdiction if determined to <br /> not be feasible. <br /> Intersection radii and geometry shall be designed to accommodate turning movements of <br /> the largest anticipated vehicle. <br /> All pavement markings shall be long life thermoplastic. Pavement markers shall be <br /> installed if they previously existed on the roadway. <br /> The permitee shall be responsible for the installation and relocation of any additional <br /> highway signs that may be necessary due to these improvements and shall comply with <br /> the requirements of the MUTCD. <br /> Feel free to contact me if you have any questions. <br /> Sincerely, <br /> DocuSigned by: <br /> C. N dwark Ir., Pf <br /> C60BB6060F8A458... <br /> C. N. Edwards Jr., PE <br /> District Engineer <br /> Cc: W.R. Archer, III, PE, Division Engineer <br /> Tammy Germiller, NCDOT MSTA <br /> Orange County <br />