Browse
Search
Agenda 09-04-2025; 5-a - Zoning Atlas Amendment – 4809 Friends School Road, Durham, Chapel Hill Township
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2025
>
Agenda - 09-04-2025 Business Meeting
>
Agenda 09-04-2025; 5-a - Zoning Atlas Amendment – 4809 Friends School Road, Durham, Chapel Hill Township
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2025 2:29:17 PM
Creation date
8/28/2025 2:09:47 PM
Metadata
Fields
Template:
BOCC
Date
9/4/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda for September 4, 2025 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2025\Agenda - 09-04-2025 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
87 <br /> Required Improvements by the Applicant: <br /> Pursuant to NCGS 136-18(29a) and 19A NCAC 02C.0116, and as a condition of the <br /> pending NCDOT driveway permit, the applicant will need to construct the following <br /> improvements determined by NCDOT as necessary and required to adequately mitigate <br /> the traffic impacts attributable to the new school and ensure acceptable traffic operation. <br /> Unless otherwise specified, the applicant shall complete and place into operation all <br /> required improvements prior to opening the school access to public traffic. <br /> External to Site: <br /> • There are no required,reimbursable external improvements associated with this <br /> school. <br /> Internal to Site: <br /> • Upgrade the existing gravel driveway on Mount Sinai Road to provide one ingress <br /> lane and one egress lane under stop control per NCDOT minimum requirements. <br /> • Configure the site to accommodate anticipated high demand internal queues as <br /> stated above. <br /> • Implement the on-site traffic management plan provided in the TIA with <br /> appropriate adjustments as needed based on field conditions to ensure efficient <br /> operation and on-site accommodation of queues. <br /> These internal site improvements are the responsibility of the school system and are not <br /> reimbursable by NCDOT. <br /> General Requirements: <br /> It is necessary to obtain an approved driveway permit and/or encroachment agreement(s) <br /> prior to performing work on the NCDOT right of way. As a condition of the permit, the <br /> permitee shall be responsible for design and construction of the above stipulated <br /> improvements in accordance with NCDOT requirements. An approved permit will be <br /> issued upon receipt of approved site plan, roadway and plans, inspection fee, and any <br /> necessary performance and indemnity bonds. <br /> The applicant shall dedicate any additional right of way necessary to accommodate the <br /> required road improvements or future improvements as stipulated. <br /> The applicant shall verify that the proposed street and driveway connections provide for <br /> adequate vertical and horizontal sight distances in accordance with NCDOT <br /> requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.