Browse
Search
Agenda 09-04-2025; 5-a - Zoning Atlas Amendment – 4809 Friends School Road, Durham, Chapel Hill Township
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2025
>
Agenda - 09-04-2025 Business Meeting
>
Agenda 09-04-2025; 5-a - Zoning Atlas Amendment – 4809 Friends School Road, Durham, Chapel Hill Township
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2025 2:29:17 PM
Creation date
8/28/2025 2:09:47 PM
Metadata
Fields
Template:
BOCC
Date
9/4/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda for September 4, 2025 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2025\Agenda - 09-04-2025 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
85 <br /> f. Number and dimensions of designated parking spaces for activity buses <br /> g. Number of designated parking spaces for employees <br /> h. Number of visitor parking spaces <br /> i. Number of student parking spaces <br /> j. Entry/exit points of adjacent parcels <br /> k. The estimated water usage for structures, landscaping, and athletic fields <br /> I. Note that standards contained in Section 6.4 Performance Standards shall be <br /> met. <br /> m. In addition to the use described in the project summary, please specifically call <br /> out the proposed land use as "Schools: Preparatory." <br /> 5. Provide an additional sheet in the plan set to address landscaping requirements in UDO <br /> Section 6.8, primarily including details on existing vegetation, primary and secondary <br /> tree protection areas, and a planting schedule. Please note on the sheet the planned <br /> tree protection measures and barrier method. Per UDO Section 6.8.4 Protection of <br /> Existing Vegetation, tree protection fencing shall be a minimum of four feet in height, of <br /> durable construction, and shall be placed outside of the drip line of the tree(s) to be <br /> protected. <br /> 6. Please provide an additional sheet in the plan set detailing parking per Section 6.9, road <br /> improvements, sight triangles, and stacking spaces for student drop off. <br /> 7. Confirm if there will be any outdoor storage. If proposed, please show on the site plan. <br /> 8. Confirm if there will be any signage. If proposed, please show on the site plan. <br /> 9. Confirm if there will be any outdoor lighting. If proposed, please add a note stating any <br /> proposed outdoor lighting shall meet Section 6.11 of the UDO. <br /> 10.A Neighborhood Information Meeting (NIM) is required for the conditional rezoning <br /> application based on Section 2.9.1(D) of the UDO. The meeting shall be held a minimum <br /> of 14 days prior to the date of the Planning Board meeting. <br /> Matt Taylor <br /> Solid Waste Date: 2/27/25 Staff: mtaylor(aD_orangecountync.gov <br /> 919-918-4905 <br /> 1. No Comments <br /> Stormwater Christopher Sandt <br /> Management Date: 3/3/25 Staff: csandt(a-)_orangecountync.gov <br /> 919-245-2583 <br /> 1. The project is located in the Jordan Lake Unprotected Watershed Overlay District. The <br /> submittal of a Stormwater Management Plan (SMP) is required if the proposed Land- <br /> Disturbing Activity exceeds 21,780 square feet (for non-residential use). Land <br /> disturbance thresholds are cumulative to parent tract and will carry over to any/all <br /> subdivided lots. <br /> Transportation Darlene Weaver <br /> Services Date: 3/4/2025 Staff: dweaverC@orangecountync.gov <br /> 919-245-2002 <br /> 1. The Traffic Impact Analysis indicates that pedestrian and bicycle activity during peak <br /> hours is relatively low. This may be attributed to the existing pedestrian and bicycle <br /> infrastructure in this area of the county. We recognize the importance of improving these <br /> facilities and are currently working on our County Bike and Pedestrian Plan, with Stantec <br /> as our lead consulting partner. We anticipate that the plan will be completed by Fall <br /> 2025. <br />
The URL can be used to link to this page
Your browser does not support the video tag.